Skip to main content

RINA Consulting starts to lower Morandi Bridge sections

Deconstruction of the collapsed Morandi Bridge in Genoa, Italy, has begun, according to RINA Consulting. The first bridge deck section was lowered to the ground from a height of 48m, said Roberto Carpaneto, chief executive of RINA which is responsible for design control and construction management of the project. "We are really satisfied with how this delicate operation is being conducted with the whole construction team working as one to guarantee the best result.” RINA Consulting was chosen by the c
February 14, 2019 Read time: 2 mins

Deconstruction of the collapsed Morandi Bridge in Genoa, Italy, has begun, according to RINA Consulting.

The first bridge deck section was lowered to the ground from a height of 48m, said Roberto Carpaneto, chief executive of RINA which is responsible for design control and construction management of the project. "We are really satisfied with how this delicate operation is being conducted with the whole construction team working as one to guarantee the best result.”

RINA Consulting was chosen by the commissioning structure for project management, construction supervision, health and safety overview and quality assurance during the execution phase of the bridge’s demolition and the construction of the new one on the Polcevera valley.

The new 1.1km bridge has been designed by Renzo Piano and will be more than 45m high. The bridge should be open to traffic my mid 2020.

RINA provides services across the energy, marine, certification, transport and infrastructure sectors. Turnover in 2017 was €437 million and the group has around 3,700 employees and 170 offices in 65 countries.

 The longest span of the 1.18km bridge was 210m and the structure had a 40m clearance above the river Polcevera. It was opened in 1967 officially as the Polcevera Viaduct and was part of the A10 motorway as well as European route E80.

It featured diagonal cable-stays with vertical trestle-like supports made up of sets of Vs. One set carrying the roadway deck, while the other pair of inverted Vs supported the top ends of two pairs of diagonal stay cables.

The bridge was closed to traffic in August last year after the longest span collapsed during a major storm, killing 43 people. The bridge had a history of high maintenance costs.

Related Content

  • Denmark: construction of Storstrøm Bridge officially gets underway
    September 27, 2018
    Denmark’s Minister of Transport Ole Birk Olesen has turned the sod to officially start construction of the new 4km road and rail Storstrøm Bridge. The €549 million bridge is scheduled to open for road traffic in 2022 and for rail traffic in 2023. The project budget includes the cost for demolition of the existing bridge that opened in 1937. The 24m-wide single-support cable-stayed structure will connect the islands of Zealand to Falster and touch down on the smaller Masnedø Island.
  • Doka delivers cantilevering for super-slim piers at Lahntal Bridge
    October 21, 2016
    Doka’s formwork expertise is currently in demand during the construction of one of the busiest motorway viaducts in Germany. The 400m six-lane Lahntal Bridge in Limburg dates from the early 1960s. Every day about 100,000 vehicles cross the bridge that spans the valley of the River Lahn. But traffic loads have increased sharply, so a new bridge is being built sited just a few metres west of the old viaduct. The new Lahntal viaduct will measure a massive 43.5m in width, enabling eight lanes plus hard shoul
  • Riga's newest bridge improved traffic flow
    April 11, 2012
    An alliance of companies has come together to realise major infrastructure projects in Latvia including its biggest bridge. Patrick Smith reports. Riga, the Latvian capital, has the finest collection of Art Nouveau buildings in Europe and its centre is on the UNESCO World Heritage List.
  • Riga's newest bridge improved traffic flow
    May 9, 2012
    An alliance of companies has come together to realise major infrastructure projects in Latvia including its biggest bridge. Patrick Smith reports. Riga, the Latvian capital, has the finest collection of Art Nouveau buildings in Europe and its centre is on the UNESCO World Heritage List. The city of some 750,000 people (the country's total population is 2.2 million) is bounded to the south by Lithuania and to the north by Estonia, and is the second largest in Baltic States. To the east is Russia and Belarus.