Skip to main content

Residents near Mersey Gateway Bridge to get up to 300 free journeys a year

Halton Borough Council has revealed that all eligible residents within the North West England borough will receive up to 300 free journeys per year when the new Mersey Gateway Bridge between Runcorn and Widnes and the current Silver Jubilee Bridge become tolled in 2017. The scheme, expected to revitalise an area hit hard by the ongoing tough European economic climate, was approved at a full Halton Borough Council meeting last night (11 December 2013).
December 12, 2013 Read time: 3 mins
Artist’s impression of the completed Mersey Gateway Bridge
Halton Borough Council has revealed that all eligible residents within the North West England borough will receive up to 300 free journeys per year when the new 6126 Mersey Gateway Bridge between Runcorn and Widnes and the current Silver Jubilee Bridge become tolled in 2017.

The scheme, expected to revitalise an area hit hard by the ongoing tough European economic climate, was approved at a full Halton Borough Council meeting last night (11 December 2013).

A new six-lane toll bridge over the River Mersey will be the centrepiece of the Mersey Gateway Bridge. The project, including the start of tolling on the Silver Jubilee Bridge, will generate 470 permanent full-time equivalent jobs on site during construction, 4,640 permanent direct and indirect jobs, quicker journey times by up to 10 minutes in peak periods, and an improvement in journey time reliability.

Councillor Rob Polhill, Leader of Halton Council said, “We have lobbied hard for no tolls on the new bridge and on the Silver Jubilee Bridge, but the Government are clear – no tolls, no bridge –  and we all know a new bridge is desperately needed. We must now all accept, however painful, that tolls on Mersey Gateway and Silver Jubilee Bridge are a given and get on with the building phase without further delay and uncertainty.

“However, as we committed from the outset, we have spent many months looking for the best local user discount scheme we can get for Halton residents.

“The discount scheme has to be affordable from within the project and comply with the legal powers in the Tolling Orders approved by the Inspector at the Planning Inquiry, and Government have also limited Halton when it comes to the amount we can spend on discounts.  

“However, the Mersey Gateway procurement process has delivered savings and I am pleased to report the Council has agreed to use these savings to give Halton residents a better discount scheme than we could have given under the Government’s tight financial restrictions.

“I hope this demonstrates the commitment of the Council to reducing the burden of tolling on Halton’s residents.

“We will continue to press the Government to maximise the re-investment of any extra toll income to ensure that Halton residents get the best deal possible.”

In June this year Merseylink was announced as the preferred bidder for the US$3.12 billion (£2bn) Mersey Gateway Project.

For more information on companies in this article

Related Content

  • Reduced emissions, costs, with recycled asphalt
    February 21, 2012
    Recycling is a key issue for asphalt road construction, with many technologies now coming to market. Bith an ever increasing emphasis on sustainability forcing change in the construction sector in Europe and North America, the highway sector now has to seek new solutions.
  • “Bold and brave” rallying call to cash-starved UK highway maintenance teams
    July 24, 2012
    UK local authorities and other organisations must be “bold and brave” in their structuring of repair and maintenance works, delegates at a key road engineering conference in Birmingham, central England were told. Speaking at the Developments in Pavement Assessment (DIPA 2012) event Les Hawker, highways manager at Transport for London (TfL), said: “There is no extra money and only 20% of the [Government budget] cuts have taken place so far. Over the next five years the other 80% of cuts will come through. Or
  • Europe extends engine emissions deadline
    November 5, 2020
    The vote paves the way for the final adoption and publication in the Official Journal of the amended version of Regulation (EU) 2016/1628.
  • Costa Rica road projects moving forward - slowly
    July 18, 2017
    Costa Rica is moving ahead with a series of major road projects, but progress is proving slower than anticipated or desired. The Costa Rica Government is struggling to achieve satisfactory progress with its overall road improvement programme. So far the key focus has been on maintaining existing links rather than building and improving road connections. The country’s National Laboratory for Structural Material and Models (Lanamme) has produced a report revealing that 85% of the national roads are in accepta