Skip to main content

Residents near Mersey Gateway Bridge to get up to 300 free journeys a year

Halton Borough Council has revealed that all eligible residents within the North West England borough will receive up to 300 free journeys per year when the new Mersey Gateway Bridge between Runcorn and Widnes and the current Silver Jubilee Bridge become tolled in 2017. The scheme, expected to revitalise an area hit hard by the ongoing tough European economic climate, was approved at a full Halton Borough Council meeting last night (11 December 2013).
December 12, 2013 Read time: 3 mins
Artist’s impression of the completed Mersey Gateway Bridge
Halton Borough Council has revealed that all eligible residents within the North West England borough will receive up to 300 free journeys per year when the new 6126 Mersey Gateway Bridge between Runcorn and Widnes and the current Silver Jubilee Bridge become tolled in 2017.

The scheme, expected to revitalise an area hit hard by the ongoing tough European economic climate, was approved at a full Halton Borough Council meeting last night (11 December 2013).

A new six-lane toll bridge over the River Mersey will be the centrepiece of the Mersey Gateway Bridge. The project, including the start of tolling on the Silver Jubilee Bridge, will generate 470 permanent full-time equivalent jobs on site during construction, 4,640 permanent direct and indirect jobs, quicker journey times by up to 10 minutes in peak periods, and an improvement in journey time reliability.

Councillor Rob Polhill, Leader of Halton Council said, “We have lobbied hard for no tolls on the new bridge and on the Silver Jubilee Bridge, but the Government are clear – no tolls, no bridge –  and we all know a new bridge is desperately needed. We must now all accept, however painful, that tolls on Mersey Gateway and Silver Jubilee Bridge are a given and get on with the building phase without further delay and uncertainty.

“However, as we committed from the outset, we have spent many months looking for the best local user discount scheme we can get for Halton residents.

“The discount scheme has to be affordable from within the project and comply with the legal powers in the Tolling Orders approved by the Inspector at the Planning Inquiry, and Government have also limited Halton when it comes to the amount we can spend on discounts.  

“However, the Mersey Gateway procurement process has delivered savings and I am pleased to report the Council has agreed to use these savings to give Halton residents a better discount scheme than we could have given under the Government’s tight financial restrictions.

“I hope this demonstrates the commitment of the Council to reducing the burden of tolling on Halton’s residents.

“We will continue to press the Government to maximise the re-investment of any extra toll income to ensure that Halton residents get the best deal possible.”

In June this year Merseylink was announced as the preferred bidder for the US$3.12 billion (£2bn) Mersey Gateway Project.

For more information on companies in this article

Related Content

  • Well-educated personnel are the best investment for the future says the Ammann international training centre
    May 20, 2014
    Far too often, managers will view training as a luxury and not as a competitive and strategic necessity. Lazy team leaders regularly argue that it is a waste of time and money training their people, not least because these same trainees might subsequently leave the organisation. Courses are seen as an interruption, and a good way to delay things. There is always something much more pressing and important on the to-do list and staff can end up feeling forced into the training department. But these are weak a
  • UK to get tough on road works disruption
    March 19, 2012
    Utility companies who take too long to complete their road works in the UK will face higher charges, transport minister Norman Baker has announced. All utility companies who dig up the road must agree a time frame for their works with the local council.
  • The use of concrete cutting tools and tips for users
    October 8, 2015
    Despite the proven importance of identifying metal targets and electrical lines before cutting into concrete, every day there are stories about mishaps that happen when the necessary reconnaissance is not done. In this article, a few firms that provide concrete scanning services weigh in on the critical importance of locating embedded and or buried obstructions by scanning for these features using ground penetrating radar (GPR). Also offered are tips for selecting the best GPR equipment and best practices f
  • JCB is stoked in Stoke
    February 7, 2022
    The UK city of Stoke-on-Trent has repaired 10,000m² of road with the JCB PotholePro in 130 days.