Skip to main content

Report reveals many German bridges need repairs

A worrying report in Germany has revealed that up to 20% of the country’s bridges on its Federal Roads need refurbishing or rebuilding.
February 22, 2012 Read time: 1 min
A worrying report in Germany has revealed that up to 20% of the country’s bridges on its Federal Roads need refurbishing or rebuilding. The report has been released by Germany's Federal Transport Ministry and suggests that €6.8 billion will need to be spent. In all the Federal Roads in Germany have some 38,300 bridges. Meanwhile the country also has plans for 850 new bypass road sections, which is expected to cost €6.8 billion. However, repairs to road surfaces damaged by frost have been set as a higher priority than construction of new bypasses.

Related Content

  • Grimsby’s Corporation Bridge work extended
    March 6, 2024
    Refurbishment of the nearly 100-year-old bascule bridge in northern England is being done by Spencer Group with project management by Equans.
  • Nepal's upgraded links
    May 25, 2012
    The Indian Government is providing assistance for road construction work in neighbouring Nepal. This assistance is for building the Kulekhani – Kathmandu road section, which will be widened and upgraded with an asphalt surface. The road will be widened to 7.5m and the work is being carried out by Indian Contractor Golden Goods. Meanwhile asphalt surfacing work is has now been completed on Nepal’s Hetauda-Bhimphedi-Kulekhani-Pharphing-Chaimale road Section. Surfacing work is in hand on the remaining 21km sec
  • Construction materials and road design in East Africa
    June 25, 2013
    An envisaged shortage in the supply of angular rock or crushed stone in Tanzania and a determination to conserve the environment by Kenyan authorities dictated the engineering design of a multi-national road linking the two largest economies in Eastern Africa. Shem Oirere reports The cost of buying crushed stone or hiring a site for mining the material and the expenses of moving it from the crushing site to the project area, saw designers opt for an intermediate alignment and discarding of the inner and out
  • Stockholm’s new bypass
    March 8, 2021
    Tunnels make up 18km of the 21km of the Swedish capital’s E4 Bypass mega-project. It will have taken 15 years from start to opening in 2030, if all goes well