Skip to main content

Replace bridge for Vancouver’s Massey Tunnel could aid congestion

Opponents of a proposed 10-lane bridge near Vancouver, Canada, said the structure will encourage urban sprawl in a region that is already struggling with a booming population. The British Columbia provincial government recently opened the final round of public consultation for the planned 3.3km toll bridge likely to cost around US$2.54 billion.
December 21, 2015 Read time: 3 mins
Will the planned bridge contribute to urban sprawl? (picture courtesy BC government)

Opponents of a proposed 10-lane bridge near Vancouver, Canada, said the structure will encourage urban sprawl in a region that is already struggling with a booming population.

The British Columbia provincial government recently opened the final round of public consultation for the planned 3.3km toll bridge likely to cost around US$2.54 billion.

It will replace the Massey Tunnel under the Fraser River. The tunnel is operating to its capacity of 80,000 vehicles a day, often causing heavy congestion during rush hour morning and night.

Construction of the new bridge, which is yet to be officially named, is expected to start in 2017 and be complete in 2022 when it will replace the tunnel, directly below it.

The tunnel will be closed due to the increasingly high cost of maintaining the structure that was opened in 1959 and also because it fails to meet the latest seismic requirements. Canada’s west coast is along the 1,000km Cascadia fault that stretches from Northern Vancouver Island to Cape Mendocino in northern California.

The 10-lane bridge will be the province's longest and feature a high-occupancy vehicle as well as cycle and pedestrian paths. Upgrades to the highway will include new interchanges on Westminster Highway, Highway 17A and Steveston Road.

Consultation opened in mid-December and focuses on a review of the provincial government’s 48-page Project Definition Report that states the province plans to fund the project at least in part through tolls. The government is also exploring other funding partnerships for the bridge which would connect key regional gateways including Vancouver International Airport and the several major border crossings with the United States.

Consultation ends on January 28, but critics quickly slammed the project, according to a report by the Canadian Broadcasting Corporation. "Ever since we turned our back to freeways in the late 1960s, we're not trying to build our way out of congestion," noted Ken Cameron, former manager of policy and planning at Metro Vancouver.

"Putting in a big new facility like this runs directly counter to all of those objectives [of] the city of Vancouver, the city of Richmond and the other municipalities… Inevitably, history tells us, over time … new roads go up, with new traffic, and more congestion, and sooner or later you're right back where you started from."
Cameron said the government is not looking at the bigger picture of integrated transportation in the region. Instead, politicians are seeking a quick fix using one major project.

He reportedly also claimed that "tolling is literally a medieval technology”. Toll prices have yet to be finalised but will be based on funding from the federal government, Port Metro Vancouver and the final construction contracts, all of which have yet to be negotiated.

A member of the provincial legislature warned that the toll would put people off from using the bridge and they would drive dozens of miles to reach a free crossing. This would in turn create massive congestion in places where none has existed, as happened when the new Port Mann Bridge opened in 2012, she said.
Less traffic volumes would cripple the business case for the project’s funding, she also said.

Before construction can begin, the project must pass environmental and agricultural land reviews.

To see a World Highways report on dismantling the old Port Mann Bridge project, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 23103 0 oLinkInternal click here. Vidit Port mann bridge project article false /sections/key-projects/features/almost-gone-canadas-old-port-mann-bridge-deconstructed/ false false%>

Related Content

  • VIDEO: Never give a queen a lift
    May 27, 2016
    A driver in Wales drove around for a day with an estimated 20,000 unwelcome passengers until the problem got to be too evident. The video shows the car of the 65-year-old grandmother, finally parked in the small town of Haverfordwest, literally buzzing with bees. Apparently, a queen bee got stuck on the vehicle and her community decided to follow the car and stick to it as well. It took two members of the Pembrokeshire Beekeepers' Association, a park ranger and some local people to coax the travelers
  • Bentley announces finalists for the 2017 Be Inspired Awards
    August 11, 2017
    AECOM, Arcadis-WSP/PB, CH2M-Fairhurst and Highways England are among the finalists for this year’s Bentley awards for outstanding use of BIM – building information modelling. Bentley Systems, a provider of infrastructure software solutions, said that the winners will be announced at The Year in Infrastructure 2017 Conference to be held in Singapore this year, October 10-12. “The annual awards honour the extraordinary work of Bentley users advancing infrastructure design, construction, and operations through
  • BrisConnections puts its AirportlinkM7 toll road up for sale
    September 1, 2015
    Bankrupt Australian highway management firm BrisConnections is selling its 6.7km AirportlinkM7 toll road in Brisbane three years after the highway opened, according to a report by the Financial Review. Macquarie Capital and Fort Street are acting as financial advisers and PBB Advisory is the receiver. Transurban, which paid A$7.05 billion for Brisbane's five other toll roads last year, is seen as the likeliest buyer, with indicative bidding starting early this month for closure of a deal early next year, ac
  • North Marmara Motorway connecting roads tenders postponed again
    September 2, 2015
    Tenders for construction of connecting roads for Istanbul's third bridge over the Bosporus have been postponed for the fourth time. A tender for the Kurtkoy-Akyazi motorway tender will be held on March 1 next year with that for the Kinali-Odayeri road will be held a week later, the Dünya Gazetesi newspaper reported. The tenders will be held as part of the 260km North Marmara Motorway project that includes the soon to be completed Yavus Sultan Selim Bridge. Completion of the connecting roads is plan