Skip to main content

Repair works on Indonesia’s flood-damaged roads to cost up to US$169.24mn

Up to US$169.24 million (IDR 2.03 trillion) is needed to repair Indonesia’s roads damaged in floods in several parts of the country, according to Indonesia's Public Works Ministry. Of this, $42.33 million (IDR 510 billion) would be for temporary repairs on roads in South Sumatra, Java, North Sulawesi, Bengkulu, and Northeast Sulawesi, with the remaining funds required for permanent repairs. The ministry's Director General for Highways Djoko Murjanto added that concrete rigid pavement is being considered to
February 6, 2014 Read time: 1 min
Up to US$169.24 million (IDR 2.03 trillion) is needed to repair Indonesia’s roads damaged in floods in several parts of the country, according to Indonesia's Public Works Ministry. Of this, $42.33 million (IDR 510 billion) would be for temporary repairs on roads in South Sumatra, Java, North Sulawesi, Bengkulu, and Northeast Sulawesi, with the remaining funds required for permanent repairs.

The ministry's Director General for Highways Djoko Murjanto added that concrete rigid pavement is being considered to be used in future road development in West Java.

Related Content

  • Indonesia set for major PPP infrastructure tendering round
    March 10, 2015
    The Indonesian government is getting ready to tender for major infrastructure projects including roads to be developed under public-private partnership (PPP) contracts, the Jakarta Post reported. Public Works and Public Housing minister Basuki Hadimuljono said in Jakarta that the first priorities would be on the 94km Balikpapan-Samarinda toll road, the 7km Manado-Bitung toll road in North Sulawesi and a drinking water treatment system project in western Semarang, central Java. The projects will prove that P
  • Poland: GDDKiA sets winter road maintenance budget
    October 22, 2014
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) is planning to spend US$151.37 million (€118.3 million) on winter-specific road maintenance for 2014/15. Around 2,300 snowploughs and 1,300 salt trucks will be readied for winter work. GDDKiA also plans to install more than 1,400km snow-protection screens along roads. Meanwhile, the country is moving ahead with several key highway projects, one involving construction of three sections of the new southern ring road around the Polish c
  • FHWA providing US$729 million funding for emergency road repairs
    February 5, 2024
    The FHWA is providing US$729 million in funding for emergency road repairs in US states and protectorates.
  • Indonesia cancels Sunda Strait Bridge connecting Java and Sumatra
    November 11, 2014
    Indonesia pulls back from Sunda Strait Bridge connecting Java and Sumatra Indonesia appears to have shelved construction of a 30km bridge that would have connected the islands of Sumatra and Java – a US$23 billion project. The structure -- a dream of Indonesia's political elite since the 1960s -- was to have three lanes of traffic in each direction, twin rail tracks and cabling for telecommunications and electricity. But the Jakarta Post newspaper reported that recently elected President Joko Widodo had