Skip to main content

Refurbishing Heathrow road tunnel

A Positioner-Actuator-Manipulator (PAM)machine on hire from UK dealer STM of Tring has been able to cut concrete removal time for Bam Nuttall on its €116.2 million tunnel refurbishment contract at Heathrow Airport. The 18-month contract involves major work on the main and cargo tunnels serving Terminals 1, 2 and 3 in order to comply with the latest European standards and also to extend the life of the tunnels for a further 60 years. As part of the project, some 206m2 of concrete repairs were needed to be
December 11, 2015 Read time: 2 mins
The Canadian built PAM unit was used for the Heathrow Tunnel refurbishment
A Positioner-Actuator-Manipulator (PAM)machine on hire from UK dealer STM of Tring has been able to cut concrete removal time for 3137 Bam Nuttall on its €116.2 million tunnel refurbishment contract at Heathrow Airport. The 18-month contract involves major work on the main and cargo tunnels serving Terminals 1, 2 and 3 in order to comply with the latest European standards and also to extend the life of the tunnels for a further 60 years.

As part of the project, some 206m2 of concrete repairs were needed to be carried out. Bam Nuttall opted to use the Canadian built PAM unit, which allowed work to continue throughout the 10.30 pm to 5.30 am possession time. The breaker is firmly secured to an air-over-hydraulic powered two-piece arm, which isolates vibration from the PAM's controls. The unit is mounted on four castors or removable road wheels and can be pushed into position prior to applying the brake and deploying outrigger legs for stability during operation. Weighing only 525kg without a tool in place, the machine can be easily transported in a conventional van.

For more information on companies in this article

Related Content

  • Cold winters ravage roads requiring repairs
    January 7, 2015
    Detroit is one of the three worst cities in the US for poor weather, along with Chicago and Toledo For Metro Detroit the winter of 2013-14 was the second snowiest season on record, bested only by the winter of 1880-1881. This had a terrible effect on the city’s roads and in the suburb of Southfield, officials assessed the poor state of the asphalt and concrete streets and realised the conventional patch and fill programme would not be sufficient.Instead the contract was modified to cover mill and resurfacin
  • Doosan’s DL280-5 wheeled loader fronts the 12-model series
    February 28, 2018
    Doosan’s new DL280-5 wheeled loader is aimed specifically for waste, recycling and general industrial duties. The DL280-5 is the latest unit in the high-performance 12-model wheeled loader range of operating weights from 12-35 tonnes. It also comes as the company celebrates a milestone – 400,000 units sold in Doosan’s 40-year history. The front lift arm of the DL280-5 is powered by a closed centre hydraulic system with a 210 litre/min axial piston pump for maximum hydraulic performance without producing
  • Sandvik machines help improve quarry output in Thailand
    June 6, 2016
    The Prachuap Khiri Khan region of Thailand is well known for producing high quality aggregates, with four quarries and six concrete plants in operation. A key producer is Tabsakae Granite, which now operates a complete mobile crushing and screening plant. The Sandvik Construction QJ341 jaw crusher, QH331 Hydrocone crusher and a QA451 triple deck Doublescreen are now delivering high production of quality aggregates. Tabsakae Granite operates a quarry and a concrete plant in the Prachuap Khiri Khan region
  • Compact machines deliver more - for less
    February 14, 2012
    The mini and midi excavator sector continues to squeeze more out of less, with some innovative engineering solutions being applied to zero- and short-tailswing models - Geoff Ashcroft investigates. It is a vicious circle - customers seek smaller, tighter, ever more compact excavators, leaving manufacturers with the challenges of squeezing greater levels of technology into what is all too often an even smaller machine.