Skip to main content

Record-setting sea crossing proposed

The authorities in Oman are working on plans for a 40km bridge link. This bridge would connect to Masirah Island and would cross over the sea. The authorities hope to open the tender process some time during 2011. The project is expected to cost in the region of US$1.5 billion and faces many technical challenges.
May 28, 2012 Read time: 1 min
RSSThe authorities in Oman are working on plans for a 40km bridge link. This bridge would connect to Masirah Island and would cross over the sea. The authorities hope to open the tender process some time during 2011. The project is expected to cost in the region of US$1.5 billion and faces many technical challenges. It also faces some environmental questions as Masirah Island provides a habitat for greenbacks and loggerhead turtles and any work carried out would have to avoid causing harm to the wildlife.

Related Content

  • A key bridge project in Bangladesh will be financed by loans from Malaysia
    April 11, 2012
    Work on a key bridge link in Bangladesh is to be financed by a loan provided by Malaysia. The Bangladesh Government and Malaysian Government have signed a memorandum of understanding for the construction of Padma bridge.
  • Learning from Russia's controversial road project
    February 9, 2012
    The International Road Federation (IRF), founded in 1948, is the only world forum advocating better and safer roads through better road design and construction bearing in mind the user. It is a unique institution that brings together members active in road infrastructure from both the private and public sectors. The IRF promotes roads that are safe, economically viable and ecologically friendly. The IRF believes that a sound road infrastructure brings prosperity, fights poverty, furthers education and gi
  • Francis Scott Key Bridge demolition
    July 3, 2025
    Demolition is planned for the Francis Scott Key Bridge.
  • Norway drops tender plans for second Sotra fixed link
    February 18, 2019
    Statens Vegvesen, the Norwegian Road Administration, has cancelled tender plans for a new Sotra fixed link project that were scheduled for the spring. Jon Georg Dale, minister of transport, recently told the Norwegian Parliament that the geology near Lake Storavatnet along the route of the project, of which the second bridge would be a part, has caused concern among planners. Also, reconstruction of a high-voltage power cable has come under questions. Helge Eidsnes, a regional manager of Statens Vegve