Skip to main content

Re-gravelling roads in South Africa

Consultant Mott MacDonald is providing assistance for an important project for the re-gravelling of roads in South Africa’s Western Cape. The firm is helping the Western Cape Government with planning, design and control aspects of the maintenance of gravel roads within the Overberg region, one of four regions in the province. The consultancy is also working with local provincial maintenance teams and supporting the development, improvement and management of materials supply. There are around 10,000km of
August 20, 2015 Read time: 2 mins
Repairing rural roads in South Africa will improve access to the Western Cape
Consultant 2579 Mott MacDonald is providing assistance for an important project for the re-gravelling of roads in South Africa’s Western Cape. The firm is helping the Western Cape Government with planning, design and control aspects of the maintenance of gravel roads within the Overberg region, one of four regions in the province. The consultancy is also working with local provincial maintenance teams and supporting the development, improvement and management of materials supply.

There are about 10,000km of gravel roads within the Western Cape (excluding minor roads), of which approximately 1,300km are located within the Overberg region. These rural roads are susceptible to changes in traffic volumes, material properties, precipitation, temperature and even flooding, which can lead to increased deterioration. Regular maintenance activities include re-gravelling or spot re-gravelling, reworking, hard or regular blading, patching, and pothole and shoulder repairs. Suitable material sources available, such as shale, mudstone, sandstone, limestone, granite or ferricrete, need to be sourced sustainably and where possible aggregate will be obtained locally through borrow pits.

Mott MacDonald has previously supported re-gravelling and maintenance strategies in the Western Cape Province. The consultancy is using this experience to develop strategic planning and optimisation models for the sourcing and use of suitable materials from borrow pits. The condition of gravel roads will undergo detailed visual assessments and combined with annual panel inspections will contribute to an overall view of the management of the road network. 

For more information on companies in this article

Related Content

  • Groundbreaking calculator of greenhouse gas emissions
    April 12, 2012
    IRF launches CHANGER, a groundbreaking calculator of greenhouse gas emissions from road construction. Our world is changing, our climate is changing. Industry too is changing to meet the new social, environmental and economic challenges of our times. Already, the road sector has taken a decisive lead in this respect by transforming its practices and adopting new, more eco-friendly techniques and technologies. CHANGER is the latest flagship project in this evolution: the sign of an indust
  • Pothole and marking options
    February 21, 2012
    Ennis Prismo Traffic Safety Solutions now has a quick solution to pothole patching problems and temporary road marking needs.
  • Nova Scotia sets road budget for 2019-20 at US$224 million
    December 20, 2018
    The Canadian province of Nova Scotia will get US$224 million for road upgrades in 2019-20, a boost of $11.2 million over the current period. Lloyd Hines, the province’s transportation and infrastructure renewal minister, said much of the additional funding will be for twinning portions of the province’s 100 series highways, including the 101, 103, 104 and the 107 Sackville-Burnside connector. The plan includes rebuilding and upgrading gravel roads and around $15 million of the money has been earmarked
  • Upgrading a busy A road link in the UK
    July 4, 2018
    The upgrade to the UK’s busy A14 route will address a significant traffic bottleneck - Mike Woof writes The UK is suffering badly from traffic congestion, a problem that is particularly severe in and around its major cities. Lack of investment in road construction over many years has resulted in a major backlog of work, while the country has seen growing vehicle numbers. To make matters worse, there have been few additions to the major road network since the late 1980s and early 1990s. And the combinatio