Skip to main content

Re-gravelling roads in South Africa

Consultant Mott MacDonald is providing assistance for an important project for the re-gravelling of roads in South Africa’s Western Cape. The firm is helping the Western Cape Government with planning, design and control aspects of the maintenance of gravel roads within the Overberg region, one of four regions in the province. The consultancy is also working with local provincial maintenance teams and supporting the development, improvement and management of materials supply. There are around 10,000km of
August 20, 2015 Read time: 2 mins
Repairing rural roads in South Africa will improve access to the Western Cape
Consultant 2579 Mott MacDonald is providing assistance for an important project for the re-gravelling of roads in South Africa’s Western Cape. The firm is helping the Western Cape Government with planning, design and control aspects of the maintenance of gravel roads within the Overberg region, one of four regions in the province. The consultancy is also working with local provincial maintenance teams and supporting the development, improvement and management of materials supply.

There are about 10,000km of gravel roads within the Western Cape (excluding minor roads), of which approximately 1,300km are located within the Overberg region. These rural roads are susceptible to changes in traffic volumes, material properties, precipitation, temperature and even flooding, which can lead to increased deterioration. Regular maintenance activities include re-gravelling or spot re-gravelling, reworking, hard or regular blading, patching, and pothole and shoulder repairs. Suitable material sources available, such as shale, mudstone, sandstone, limestone, granite or ferricrete, need to be sourced sustainably and where possible aggregate will be obtained locally through borrow pits.

Mott MacDonald has previously supported re-gravelling and maintenance strategies in the Western Cape Province. The consultancy is using this experience to develop strategic planning and optimisation models for the sourcing and use of suitable materials from borrow pits. The condition of gravel roads will undergo detailed visual assessments and combined with annual panel inspections will contribute to an overall view of the management of the road network. 

For more information on companies in this article

Related Content

  • Bridge and tunnel concrete testing vital for longevity
    July 9, 2012
    Modern technology is making testing more efficient and reliable, increasing productivity and reducing costs, as Patrick Smith reports A few years ago, visual inspection of an 18-year-old bridge by ARRB in Australia identified considerable cracking in the precast, prestressed deck planks as well as in the cast in situ deck overlay. Laboratory examination indicated that the deck planks and the deck overlay were suffering from a strong case of alkali-aggregate reaction (AAR). Testing of concrete cores drilled
  • Advances in materials testing
    April 10, 2012
    Quicker, better, more cost effective materials testing - Kristina Smith writes. Most developments in materials testing technology involve updating and upgrading existing machines, either to meet changes to standards or to satisfy new needs in the market. And occasionally, a manufacturer will come up with something completely new. PUMA - the precision unbound materials analyser - falls into the latter category. It has been developed by Cooper Research Technology and Nottingham Transportation Engineering Cen
  • China's Roads Convention focuses on sustainability
    February 9, 2012
    IRF joins with key Chinese transport authorities to lead the way in efforts to make sustainable rural mobility, transport and access a reality for millions throughout the world.
  • Key A14 upgrade for the UK to cut congestion
    September 11, 2013
    A joint venture comprising BAM Nuttall and Morgan Sindall will carry out the 4km widening of the UK’s heavily congested A14 route. The €28.5 million (£24 million) project is being carried out for the Highways Agency to reduce journey times more reliable, improve safety and support proposed local development. Mott MacDonald will carry out the design work for the project. Junctions 7-9 of the A14 are highly congested at present due to a combination of heavy commuter traffic and the high percentage of HGVs car