Skip to main content

Queensland airport link incurs costs

In Australia contractor Leighton Holdings intends to reclaim extra costs incurred for a major airport link road project in Queensland.
February 14, 2012 Read time: 1 min
In Australia contractor 2474 Leighton Holdings intends to reclaim extra costs incurred for a major airport link road project in Queensland. Leighton Holdings says that it was hit by extra costs for Brisbane Airport Link's road and tunnel project due to the state's floods and bad weather, design amendments and approval delays from access issues and authorities. The project's net forecast fell to US$457.3 million (A$430 million) loss. The project is expected to be ready by the end of June next year and is being built by 2641 BrisConnections, in which Leighton subsidiary 2642 Thiess is a component.

For more information on companies in this article

Related Content

  • Chilean bridge project achieves resolution
    February 26, 2020
    A resolution has been achieved for Chile’s Chiloe Island bridge project.
  • Alberta’s peaceful partnership
    May 4, 2020
    A bridge project in northern Canada threw up some unexpected challenges, reports David Arminas, from the banks of the Peace River in Alberta
  • Transport development for Mindanao in Philippines
    June 4, 2015
    A series of transportation projects are in hand for Mindanao in the Philippines. The Philippines' Mindanao Development Authority (MinDA) has said that the Mindanao Development Corridors' major infrastructure component will cost some US$14.02 billion in all. Of the total, some $5.6 billion will be spent on airports, seaports and roads. MinDA intends that these projects will get underway out in the next two years, with work planned for completion in five years. A new bridge has been proposed that will conne
  • Ensuring screening efficiency can cut costs
    September 30, 2013
    Major Wire Industries, a leading manufacturer of screen media, has determined a numbers of methods to tackle common screening problems Screen media inefficiencies can reduce product quality, production and profit as much as a poorly performing screen box. Screen media modifications cost less than screen box upgrades and can provide major benefits for little outlay. If material is coming off the end of the deck, instead of passing through the screen cloth there are several possible problems. It could be that