Skip to main content

Quebec to build new Mercier Bridge for Montreal city

The Canadian province of Quebec plans to build a US$219 million bridge across the St Lawrence River alongside the existing Mercier Bridge in the city of Montreal. Provincial government cabinet ministers Pierre Moreau and Geoff Kelley confirmed that a new bridge is forthcoming, but gave schedule for procurement or construction start, according to local media. However, Moreau said the work will begin probably before the new Champlain Bridge is finished at the start of 2019. Construction of the new Champlain B
May 12, 2017 Read time: 3 mins
The Canadian province of Quebec plans to build a US$219 million bridge across the St Lawrence River alongside the existing Mercier Bridge in the city of Montreal.


Provincial government cabinet ministers Pierre Moreau and Geoff Kelley confirmed that a new bridge is forthcoming, but gave schedule for procurement or construction start, according to local media. However, Moreau said the work will begin probably before the new Champlain Bridge is finished at the start of 2019.

Construction of the new Champlain Bridge began in June 2015, with opening scheduled for December 2018.

The aging Mercier bridge has suffered major repairs since 2013.

"The bridge is safe, but it will require until it's replacement $100 million of upkeep work. It's obvious we have to do something else than just upkeep the bridge," Moreau reportedly said.

The initial bridge, just under 1km long, was opened in 1934 and then twinned by construction of a second span adjacent in 1963. It crosses the St. Lawrence River and accompanying Seaway canals on the western side of the Island of Montreal to connect the Montreal borough of LaSalle with the Mohawk reserve of Kahnawake and the city suburb of Châteauguay on the south shore of the Saint Lawrence River.

The bridge is named after former premier of Quebec province, Honoré Mercier. An estimated 30 million vehicles use the bridge annually.

Last month, the 2880 Jacques Cartier and Champlain Bridges Incorporated (JCCBI), the federal Canadian agency that oversees several major road infrastructure assets in the city including the Mercier Bridge, said that tearing down the old steel truss cantilever Champlain Bridge could cost around US$300 million.

Also, until the nearby new Champlain Bridge is finished, it will cost US$93 million annually to maintain the old one, according to JCCBI. Dismantling of the structure that opened in 1962 will start in 2019 at the earliest and could take up to four years.

3260 World Highways reported in 2015 that the Canadian government had awarded the multi-billion-dollar contract for the Champlain Bridge to a consortium led by SNC-Lavalin under a 35-year public-private partnership. The consortium called Signature on the Saint-Lawrence Group includes Spanish firms 4761 Dragados Canada and 917 ACS Infrastructures and the US firm 2758 Flatiron Construction. Other members are MMM Group, T.Y. Lin International, International Bridge Technologies Canada and 981 Hochtief PPP Solutions.

Related Content

  • Aecon pulls out of Canada-US Gordie Howe Bridge project
    May 8, 2018
    Canadian construction company Aecon has withdrawn from a private group competing to construct and operate the Gordie Howe International Bridge between Canada and the US. Aecon’s departure comes only weeks before the Canadian government plans to announce the winning group. Construction of the bridge - costing more than US$3.7 billion and between Windsor in Canada’s Ontario province and Detroit in the US state of Michigan - is scheduled to start in the autumn 2018. Aecon’s chief executive reportedly denied
  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno
  • Safety measures aid workzone accident reduction
    February 20, 2012
    Everyone connected with the highway industry is involved in the efforts to cut down the number of work zone accidents. Patrick Smith reports. A few months ago, as road work resumed on America's highways and bridges, US Transportation Secretary Ray LaHood called on drivers to use extra caution in work zones. At the same time he commended the success in reducing overall roadway fatalities in each of the last seven years.
  • Consultation soon for Vancouver area’s Massey Tunnel replacement
    September 19, 2019
    The Canadian province of British Columbia could put options for a Massey Tunnel replacement out to consultation late this year or early next. A statement from the BC ministry of transportation and infrastructure said the government is in discussions with various stakeholders about which options it will put out for consultation. Whatever option is chosen to replace the ageing four-lane Massey Tunnel – be it a bridge or another tunnel – it will be will be either six or eight lanes, according to the gove