Skip to main content

Quebec to build new Mercier Bridge for Montreal city

The Canadian province of Quebec plans to build a US$219 million bridge across the St Lawrence River alongside the existing Mercier Bridge in the city of Montreal. Provincial government cabinet ministers Pierre Moreau and Geoff Kelley confirmed that a new bridge is forthcoming, but gave schedule for procurement or construction start, according to local media. However, Moreau said the work will begin probably before the new Champlain Bridge is finished at the start of 2019. Construction of the new Champlain B
May 12, 2017 Read time: 3 mins
The Canadian province of Quebec plans to build a US$219 million bridge across the St Lawrence River alongside the existing Mercier Bridge in the city of Montreal.


Provincial government cabinet ministers Pierre Moreau and Geoff Kelley confirmed that a new bridge is forthcoming, but gave schedule for procurement or construction start, according to local media. However, Moreau said the work will begin probably before the new Champlain Bridge is finished at the start of 2019.

Construction of the new Champlain Bridge began in June 2015, with opening scheduled for December 2018.

The aging Mercier bridge has suffered major repairs since 2013.

"The bridge is safe, but it will require until it's replacement $100 million of upkeep work. It's obvious we have to do something else than just upkeep the bridge," Moreau reportedly said.

The initial bridge, just under 1km long, was opened in 1934 and then twinned by construction of a second span adjacent in 1963. It crosses the St. Lawrence River and accompanying Seaway canals on the western side of the Island of Montreal to connect the Montreal borough of LaSalle with the Mohawk reserve of Kahnawake and the city suburb of Châteauguay on the south shore of the Saint Lawrence River.

The bridge is named after former premier of Quebec province, Honoré Mercier. An estimated 30 million vehicles use the bridge annually.

Last month, the 2880 Jacques Cartier and Champlain Bridges Incorporated (JCCBI), the federal Canadian agency that oversees several major road infrastructure assets in the city including the Mercier Bridge, said that tearing down the old steel truss cantilever Champlain Bridge could cost around US$300 million.

Also, until the nearby new Champlain Bridge is finished, it will cost US$93 million annually to maintain the old one, according to JCCBI. Dismantling of the structure that opened in 1962 will start in 2019 at the earliest and could take up to four years.

3260 World Highways reported in 2015 that the Canadian government had awarded the multi-billion-dollar contract for the Champlain Bridge to a consortium led by SNC-Lavalin under a 35-year public-private partnership. The consortium called Signature on the Saint-Lawrence Group includes Spanish firms 4761 Dragados Canada and 917 ACS Infrastructures and the US firm 2758 Flatiron Construction. Other members are MMM Group, T.Y. Lin International, International Bridge Technologies Canada and 981 Hochtief PPP Solutions.

Related Content

  • Gordie Howe Bridge on schedule for 2024
    June 19, 2020
    Slowdowns over COVID but time to regain momentum, says WDBA.
  • Flatiron wins Steveston work in Canada
    April 18, 2022
    The Steveston Interchange project near Vancouver is key for improving traffic flow into what will be a new immersed Massey Tunnel under the Fraser River.
  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.
  • Australian state government does a deal with East West Connect
    April 15, 2015
    The state government of Victoria in Australia will pay the East West Connect consortium US$258 million to cancel construction of Melbourne’s East West Link road tunnel. The payoff is to cover the consortium's bidding, design and pre-construction costs and draw a line under the deal that has been mired in financial controversy for years. The federal government slammed Victoria’s decision to bail out of the project as “an obscenity’’ that will cost 7000 jobs, according to a report in The Australian news