Skip to main content

Quebec to build new Mercier Bridge for Montreal city

The Canadian province of Quebec plans to build a US$219 million bridge across the St Lawrence River alongside the existing Mercier Bridge in the city of Montreal. Provincial government cabinet ministers Pierre Moreau and Geoff Kelley confirmed that a new bridge is forthcoming, but gave schedule for procurement or construction start, according to local media. However, Moreau said the work will begin probably before the new Champlain Bridge is finished at the start of 2019. Construction of the new Champlain B
May 12, 2017 Read time: 3 mins
The Canadian province of Quebec plans to build a US$219 million bridge across the St Lawrence River alongside the existing Mercier Bridge in the city of Montreal.


Provincial government cabinet ministers Pierre Moreau and Geoff Kelley confirmed that a new bridge is forthcoming, but gave schedule for procurement or construction start, according to local media. However, Moreau said the work will begin probably before the new Champlain Bridge is finished at the start of 2019.

Construction of the new Champlain Bridge began in June 2015, with opening scheduled for December 2018.

The aging Mercier bridge has suffered major repairs since 2013.

"The bridge is safe, but it will require until it's replacement $100 million of upkeep work. It's obvious we have to do something else than just upkeep the bridge," Moreau reportedly said.

The initial bridge, just under 1km long, was opened in 1934 and then twinned by construction of a second span adjacent in 1963. It crosses the St. Lawrence River and accompanying Seaway canals on the western side of the Island of Montreal to connect the Montreal borough of LaSalle with the Mohawk reserve of Kahnawake and the city suburb of Châteauguay on the south shore of the Saint Lawrence River.

The bridge is named after former premier of Quebec province, Honoré Mercier. An estimated 30 million vehicles use the bridge annually.

Last month, the 2880 Jacques Cartier and Champlain Bridges Incorporated (JCCBI), the federal Canadian agency that oversees several major road infrastructure assets in the city including the Mercier Bridge, said that tearing down the old steel truss cantilever Champlain Bridge could cost around US$300 million.

Also, until the nearby new Champlain Bridge is finished, it will cost US$93 million annually to maintain the old one, according to JCCBI. Dismantling of the structure that opened in 1962 will start in 2019 at the earliest and could take up to four years.

3260 World Highways reported in 2015 that the Canadian government had awarded the multi-billion-dollar contract for the Champlain Bridge to a consortium led by SNC-Lavalin under a 35-year public-private partnership. The consortium called Signature on the Saint-Lawrence Group includes Spanish firms 4761 Dragados Canada and 917 ACS Infrastructures and the US firm 2758 Flatiron Construction. Other members are MMM Group, T.Y. Lin International, International Bridge Technologies Canada and 981 Hochtief PPP Solutions.

Related Content

  • Canada: LINK 427 wins Ontario’s Highway 427 Expansion contract
    March 16, 2017
    LINK 427 has been selected for the US$457 million design, build, finance and maintain contract for the Highway 427 Expansion project in Ontario province. The LINK team consists of ACS Infrastructure Canada, Dragados Canada, Bot Infrastructure, Brennan Infrastructures, MMM Group and Thurber Engineering. The project, in the Toronto area, includes a new 6.6km extension of Highway 427 from Highway 7 to Major Mackenzie Drive and widening of 4km from Finch Avenue to Highway 7. Work includes building thre
  • COWI wins Massey Tunnel design contract
    February 18, 2022
    COWI will develop an eight-lane immersed tunnel for the George Massey Crossing Project near Vancouver, Canada.
  • Montreal to expand bus rapid transit on Pie-IX Boulevard
    June 5, 2018
    The Canadian province of Quebec tendered this month for expansion of the Pie-IX Boulevard bus rapid transit system between the cities of Laval and Montreal. The provincial government will contribute US$304 million out of which around $23 million will be for 28 new buses, according to the Canadian Broadcasting Corporation. Construction of the 11km stretch could start by October with completion in 2022. Pie-IX Boulevard, named after Pius IX, a Catholic pope, is a major thoroughfare on the island of M
  • Ferrovial loses control of Canada’s 407 Express Toll Road
    August 27, 2019
    Ferrovial has lost control of the 407 International highway in Canada, one of the Spanish group's star assets. The Supreme Court in the province of Ontario has ruled in favour of co-shareholder pension fund Canada Pension Plan Investment Board to buy another stake - 10.01% - in the highway. The shares are up for sale by another shareholder, Montreal-based global infrastructure engineering firm SNC-Lavalin. The court denied Ferrovial, which already has the largest shareholding at 43% in the highway, th