Skip to main content

Quebec to build new Mercier Bridge for Montreal city

The Canadian province of Quebec plans to build a US$219 million bridge across the St Lawrence River alongside the existing Mercier Bridge in the city of Montreal. Provincial government cabinet ministers Pierre Moreau and Geoff Kelley confirmed that a new bridge is forthcoming, but gave schedule for procurement or construction start, according to local media. However, Moreau said the work will begin probably before the new Champlain Bridge is finished at the start of 2019. Construction of the new Champlain B
May 12, 2017 Read time: 3 mins
The Canadian province of Quebec plans to build a US$219 million bridge across the St Lawrence River alongside the existing Mercier Bridge in the city of Montreal.


Provincial government cabinet ministers Pierre Moreau and Geoff Kelley confirmed that a new bridge is forthcoming, but gave schedule for procurement or construction start, according to local media. However, Moreau said the work will begin probably before the new Champlain Bridge is finished at the start of 2019.

Construction of the new Champlain Bridge began in June 2015, with opening scheduled for December 2018.

The aging Mercier bridge has suffered major repairs since 2013.

"The bridge is safe, but it will require until it's replacement $100 million of upkeep work. It's obvious we have to do something else than just upkeep the bridge," Moreau reportedly said.

The initial bridge, just under 1km long, was opened in 1934 and then twinned by construction of a second span adjacent in 1963. It crosses the St. Lawrence River and accompanying Seaway canals on the western side of the Island of Montreal to connect the Montreal borough of LaSalle with the Mohawk reserve of Kahnawake and the city suburb of Châteauguay on the south shore of the Saint Lawrence River.

The bridge is named after former premier of Quebec province, Honoré Mercier. An estimated 30 million vehicles use the bridge annually.

Last month, the 2880 Jacques Cartier and Champlain Bridges Incorporated (JCCBI), the federal Canadian agency that oversees several major road infrastructure assets in the city including the Mercier Bridge, said that tearing down the old steel truss cantilever Champlain Bridge could cost around US$300 million.

Also, until the nearby new Champlain Bridge is finished, it will cost US$93 million annually to maintain the old one, according to JCCBI. Dismantling of the structure that opened in 1962 will start in 2019 at the earliest and could take up to four years.

3260 World Highways reported in 2015 that the Canadian government had awarded the multi-billion-dollar contract for the Champlain Bridge to a consortium led by SNC-Lavalin under a 35-year public-private partnership. The consortium called Signature on the Saint-Lawrence Group includes Spanish firms 4761 Dragados Canada and 917 ACS Infrastructures and the US firm 2758 Flatiron Construction. Other members are MMM Group, T.Y. Lin International, International Bridge Technologies Canada and 981 Hochtief PPP Solutions.

Related Content

  • Canada: work officially starts on Montreal’s Champlain Bridge
    June 25, 2015
    Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion. The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019. SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-
  • Canada: Champlain Bridge deal awarded to SNC-Lavalin consortium
    April 17, 2015
    The Canadian government has awarded a multi-billion dollar contract for the Champlain Bridge in Montreal, in the province of Quebec, to a consortium led by SNC-Lavalin. The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal worth between US$2.5-$4.1 billion. The consortium called Signature on the Saint-Lawrence Group includes Spanish firms Dragados Canada and ACS Infrastructures and the US firm Flatiron Construction. Other
  • SSL settles legal issues, Champlain Bridge to open December 21
    April 18, 2018
    Montreal will get its new Champlain Bridge just before Christmas, a date agreed upon by the Canadian government and the SNC-Lavalin-led consortium. The agreement settles an outstanding lawsuit that the Consortium had filed regarding costs increases of around US$186.5 million relating to the transportation of oversized parts and delays to the bridge's construction, according to media reports. Last month SNC-Lavalin, head of the Signature on the Saint-Laurent Group (SSL), had said that the bridge over the
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow