Skip to main content

Qatar reveals plans for US$12.36bn infrastructure projects

The Government of Qatar is reportedly near to agreeing deals for delivering a number of vital road transport and other infrastructure projects worth a combined US$12.36 billion (QAR 45 billion). Seven major expressways, other road development and repair projects, and key sewage infrastructure works make up the planned projects’ package. The expressway projects will have a combined road length of 900km, subways, flyovers and 240 major interchanges. In addition, the expressway projects will also include a h
January 16, 2014 Read time: 2 mins
The Government of Qatar is reportedly near to agreeing deals for delivering a number of vital road transport and other infrastructure projects worth a combined US$12.36 billion (QAR 45 billion).

Seven major expressways, other road development and repair projects, and key sewage infrastructure works make up the planned projects’ package.

The expressway projects will have a combined road length of 900km, subways, flyovers and 240 major interchanges. In addition, the expressway projects will also include a highway for heavy vehicles, and these projects are projected to complete within the next five to seven years.

Also in Qatar, J&P Overseas and 1298 J&P AVAX have secured an $895.24 million (QAR 3.26 billion) contract from Qatar's Public Works Authority (2559 Ashghal). Under the deal, both companies will design and build the first phase of the 180km New Orbital Highway in southwest Doha. The first 45km phase represents the total length of the dual carriageway project connecting New Doha Port and Al Wakrah bypass.

Meanwhile, a Rayyan Road contract worth over $941 million (QAR 3.43 billion) has been awarded to the Dogus Holdings and Onur joint venture. Scheduled for completion in the first quarter of 2017, the project includes a network of pedestrian footpaths and cycleways along a total length of 5.3km. Another Rayyan Road project worth more than $282.7 million (QAR 1 billion) will see joint venture Six Construct Qatar and Boom Construction Company construct and upgrade 2.9km of highway, four lanes in each direction, from west of New Rayyan Roundabout to east of Bani Hajer Roundabout. The works are due to finish in Q3 2016.

For more information on companies in this article

Related Content

  • A new asphalt plant in Cameroon
    January 27, 2023
    A Lintec CSM4000 containerised asphalt plant in Cameroon has helped with the construction of the country’s first-ever expressway linking its two largest cities, Douala and Yaoundé. The new route replaces an older roadway in use for over three decades that no longer met traffic needs.
  • New road upgrade project opens to traffic in Dubai
    October 19, 2018
    The first phase of a major road upgrade project in Dubai has opened to traffic. The project to improve the Latifa bint Hamdan Street and Umm Al Sheef Street routes is worth nearly US$218 million. The second phase of the project should be complete in the first quarter of 2019. Once the work is finished it should lower journey times between Al Khalil Road and Sheikh Zayed Road, two of the most important highway arteries in Dubai. The project includes the construction of two bridge sections measuring a total
  • Shortlist set for Lower Thames tunnel work
    April 9, 2021
    Bam Nuttal, Bouygues, Dragados and Hochtief are in the running for the UK project.
  • Philippines projects proceeding as planned
    October 25, 2016
    Major expressway projects are now moving forward in the Philippines, with building due to start in the first quarter of 2017. Metro Pacific is gearing up to commence construction of the C5 Link Expressway. Meanwhile Metro Pacific Investments Corp (MPIC) has plans to commence construction of the Cavite-Laguna Expressway. The 7.6km C5 Link Expressway forms part of the Cavitex network. The US$291 million project will join the C-5 Road in Taugig to the R-1 Coastal Expressway. The $728 million Cavite-Laguna e