Skip to main content

Puerto Rico reversible road lane deal

A US$174 million road project is now commencing in Puerto Rico. The work will be carried out on the route connecting the PR-30 and PR-18 and involves reworking the road so that it features two reversible lanes. The project is expected to take 24 months in all, with the work being split into five separate phases. Construction of the first section connecting PR-175 with Montehiedra is expected to cost nearly $40 million as this complex stretch will include building four bridges as well as other civils work.
August 31, 2018 Read time: 1 min

A US$174 million road project is now commencing in Puerto Rico. The work will be carried out on the route connecting the PR-30 and PR-18 and involves reworking the road so that it features two reversible lanes. The project is expected to take 24 months in all, with the work being split into five separate phases. Construction of the first section connecting PR-175 with Montehiedra is expected to cost nearly $40 million as this complex stretch will include building four bridges as well as other civils work.

Related Content

  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • A major highway deal has been awarded by the Bosnian authorities
    May 25, 2012
    Construction work is now going ahead on the Suhodol-Tarcin section of Bosnia’s Corridor Vc highway. The Bosnian Government and highway company Autoceste FBiH Mostar signed a contract with Turkish company Cengiz Insaat Sanayi ve Ticaret for this section of the Corridor Vc highway. The deal is worth €115.2 million and will be for construction of a total of 5km of the motorway. The work is expected to take 28 months to complete. However a consortium of five construction companies from Bosnia and Herzegovina is
  • Major Colombian highway projects underway
    January 22, 2021
    A series of major Colombian highway projects is now underway.