Skip to main content

Province halts planned Vancouver bridge to replace Massey Tunnel

Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.
September 14, 2017 Read time: 3 mins
BC government puts the brakes on the George Massey Tunnel Replacement project

Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver.

Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.

One consortium is headed by Spanish company ACS and its local subsidiaries and includes Star America Infrastructure Partners and Aecon. Another of the competing consortia comprises Kiewit, Macquarie and Vinci. The third is made up of Fluor, John Laing and SNC-Lavalin.

A winner to build the 3km cable stay bridge over the Fraser River was to have been chose October 24. Instead, provincial transportation minister Claire Trevena said the newly elected New Democratic Party government will start an “independent technical review”, to be completed in the spring, of the best solution for replacing the aging George Massey tunnel.

Trevena said there will be more consultation and research to get buy-in from the community and regional mayors. “We’re not going back to square one, we’re going back to a thorough consultation with the community,” the minister reportedly said.

The Vancouver Sun newspaper reported that previous Liberal government had already spent more than $54 million on engineering and geotechnical work, public consultation, land procurement and site clearing, including preparations for eventual widening of Highway 99 which the bridge would carry.

The proposed bridge has faced continued criticism by many of Vancouver’s nearby regional city mayors, many of whom have urged the money to be put into other transportation infrastructure projects. These include replacing the 1.2km Pattullo Bridge. The through arch structure, opened in 1937, crosses the Fraser River and links the city of New Westminster to the city of Surrey.

Other suggestions are a subway along Vancouver City’s central Broadway Street corridor and a rapid transit system in Surrey.

The proposed bridge is planned directly above the George Massey Tunnel which was opened in 1959 but which suffers increasing traffic congestion. Keeping it open as an alternate route or as a route for cycling and pedestrians was mooted but the cost of maintaining an ageing structure would be prohibitive.

The plan has been to demolish the tunnel after the a new bridge is opened, although some mayor still advocate upgrading and twinning the Massey Tunnel - originally called the Deas Island Tunnel when it was opened by Queen Elizabeth in 1959. It carries a four-lane divided highway under the south arm of the Fraser River estuary, joining the City of Richmond to the north with the municipality of Delta to the south.

The George Massey Tunnel is the only road tunnel in Canada below sea level.

Related Content

  • Heavy going for heavy loads in Canada’s Alberta province
    January 9, 2019
    Canada’s Alberta province is considering a US$1.2 billion upgrade to its High Load Corridor that recently saw transportation of an 820 tonne petrochemical pipe. The 96m long tower – equivalent to a football pitch in length and about two lanes wide - was made in the capital city Edmonton, loaded onto a special trucking unit and driven the 38km to Fort Saskatchewan, mostly along provincial Highway 14 and then 21. The journey took four days and the tower, a polypropylene-propane splitter - will be instal
  • Washington DC’s historic bridge replacement project
    June 11, 2019
    The project to replace a historic bridge in US capital Washington DC is providing major challenges for its builders - Mike Woof writes
  • Galliford Try aims to downsize its construction business
    April 25, 2019
    UK construction and infrastructure business Galliford Try is reviewing its construction business with a view to downsizing. “The review will reduce the size of the construction business, focusing on its key strengths in markets and sectors with sustainable prospects for profitability and growth, where we have a track record of success,” the company said in a written statement. “The board anticipates that this review will result in reduced profitability in the current year reflecting a reassessment of
  • Bangladesh, China seal $705 million deal for Karnaphuli River tunnel
    July 2, 2015
    Bangladesh has formally signed a US$705 million deal with China Communication Construction to build a multi-lane road tunnel underneath the Karnaphuli River in Chittagong. Road Transport and Bridges secretary Man Siddique along with the government’s Road Transport and Bridges minister Obaidul Quader signed the contract with Liu Qitao, chairman of China Communication Construction. The signing took place in Beijing, according to a report in the Bangladesh newspaper The Independent.