Skip to main content

Project building new Biobio bridge in Chile on track

Construction work on the fourth bridge spanning Chile’s Biobio Bridge is proceeding on schedule. The project site is located in Chile’s Gran Concepcion area. Construction could commence in 2016, with completion expected in 2018. Environmental studies have yet to be completed however. The work will be carried out as part of a concession package and the bridge is expected to cost some US$214 million to construct, carrying two lanes for vehicle traffic as well as claiming pedestrian and cycling connectivity. T
August 28, 2014 Read time: 2 mins

Construction work on the fourth bridge spanning Chile’s Biobio Bridge is proceeding on schedule. The project site is located in Chile’s Gran Concepcion area. Construction could commence in 2016, with completion expected in 2018. Environmental studies have yet to be completed however. The work will be carried out as part of a concession package and the bridge is expected to cost some US$214 million to construct, carrying two lanes for vehicle traffic as well as claiming pedestrian and cycling connectivity. The design of the structure has yet to be finalised but the bridge itself will feature a 2.5km long section over the river, while the project length will be 6km due to the need to construct access roads. The new Biobio Bridge will be Chile’s longest, until the country’s Chacao Crossing is completed. The bridge is expected to carry a great deal of truck traffic between Talcahuano and Coronel and will be tolled, although Chile’s Truck Owner’s Association has complained that the projected tolls are now more costly than originally proposed. The northern access for the new bridge will be at the river mouth in Hualpen while to the south it will connect to the Los Batros Bridge in San Pedro de la Paz.

Related Content

  • Stonehenge tunnel going ahead?
    September 12, 2017
    The preferred route has been announced for a new road and tunnel link on the A303 route in the UK that will bypass the famous Stonehenge stone circle. The project now finally looks as if it might go ahead after years of debate, although several hurdles have yet to be passed. The work calls for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel. The new route will be located further away from Stonehenge and the tunnel is being built
  • Doka formwork rises above the Orinoco River in Venezuela
    July 8, 2016
    Taking a road and rail link across one of the biggest rivers in South America, together with its swamps and flood-plain, called for a new crossing of truly superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River, at Caicara del Orinoco, in Venezuela took shape with a formwork solution and automatic climbing technology from Doka. The bridge has an overall length of just over 11km and the main bridge is nearly 2.3km long with the roadway 55m above the river. The two ident
  • Controversial Russian bridge opens
    May 16, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link opening to use by cars. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Kamaz truck to reach the city of Kerch. The US$2.7 billion bridge forms part of
  • Finnish Motorway Finally finished: Finland's M1
    July 23, 2012
    It has taken a long time to complete, but a vital motorway link is open to traffic as Heikki Harri reports After almost 50 years of construction, the M1 motorway linking Helsinki, the Finnish capital city and Turku, the country's old capital in the southwest, is finally completed. It did not take all 50 years of construction but the first section from Helsinki towards the west was constructed in the mid -1960s. Then there was a pause until mid-1990s when the works resumed section by section. The final sect