Skip to main content

Project building new Biobio bridge in Chile on track

Construction work on the fourth bridge spanning Chile’s Biobio Bridge is proceeding on schedule. The project site is located in Chile’s Gran Concepcion area. Construction could commence in 2016, with completion expected in 2018. Environmental studies have yet to be completed however. The work will be carried out as part of a concession package and the bridge is expected to cost some US$214 million to construct, carrying two lanes for vehicle traffic as well as claiming pedestrian and cycling connectivity. T
August 28, 2014 Read time: 2 mins

Construction work on the fourth bridge spanning Chile’s Biobio Bridge is proceeding on schedule. The project site is located in Chile’s Gran Concepcion area. Construction could commence in 2016, with completion expected in 2018. Environmental studies have yet to be completed however. The work will be carried out as part of a concession package and the bridge is expected to cost some US$214 million to construct, carrying two lanes for vehicle traffic as well as claiming pedestrian and cycling connectivity. The design of the structure has yet to be finalised but the bridge itself will feature a 2.5km long section over the river, while the project length will be 6km due to the need to construct access roads. The new Biobio Bridge will be Chile’s longest, until the country’s Chacao Crossing is completed. The bridge is expected to carry a great deal of truck traffic between Talcahuano and Coronel and will be tolled, although Chile’s Truck Owner’s Association has complained that the projected tolls are now more costly than originally proposed. The northern access for the new bridge will be at the river mouth in Hualpen while to the south it will connect to the Los Batros Bridge in San Pedro de la Paz.

Related Content

  • Auckland Harbour bridge celebrates 50 years
    February 22, 2012
    The bridge over Auckland Harbour celebrates its half century this year, and it has been given a major upgrade to ensure that safety is maintained in New Zealand's largest city. Mary Searle reports. Auckland is New Zealand's largest city, home to nearly a third of the entire country's population. It's a sprawling metropolis, and its 1.3 million people are spread over 637km² of city, suburbs and islands. The Auckland Harbour Bridge, which celebrates its 50th birthday in May, is a vital link in the city's road
  • Auckland Harbour bridge celebrates 50 years
    April 5, 2012
    The bridge over Auckland Harbour celebrates its half century this year, and it has been given a major upgrade to ensure that safety is maintained in New Zealand's largest city. Mary Searle reports. Auckland is New Zealand's largest city, home to nearly a third of the entire country's population. It's a sprawling metropolis, and its 1.3 million people are spread over 637km² of city, suburbs and islands. The Auckland Harbour Bridge, which celebrates its 50th birthday in May, is a vital link in the city's road
  • New Vietnam bridge project to cut congestion
    October 24, 2016
    A new bridge project in Vietnam’s Ho Chi Minh City will help cut traffic congestion. The project is expected to cost in the region of US$157 million and four contractors will work on the construction of the 3.2km long Bình Tiên Bridge. The plans call for the bridge to carry four traffic lanes and be from 30-40m wide, although the design has yet to be finalised. The work will be carried out in two separate sections, while the client for the Bình Tiên Bridge and Road project is Ho Chi Minh’s Transport Departm
  • Additional Argentina-Chile tunnel project proposed
    January 9, 2015
    An agreement has been reached between Chile and Argentina over a long discussed tunnel project. The proposed tunnel would stretch 11.5km and connect Argentina’s Mendoza Province with Chile’s Region VI, with the project having first been mooted as far back as 1992. The cost of the proposed Paso Las Lenas Tunnel has yet to be revealed although the projected route through the Andes Mountains has been announced. The tunnel portals will be some 2,050m above sea level and the project will include the construction