Skip to main content

Project building new Biobio bridge in Chile on track

Construction work on the fourth bridge spanning Chile’s Biobio Bridge is proceeding on schedule. The project site is located in Chile’s Gran Concepcion area. Construction could commence in 2016, with completion expected in 2018. Environmental studies have yet to be completed however. The work will be carried out as part of a concession package and the bridge is expected to cost some US$214 million to construct, carrying two lanes for vehicle traffic as well as claiming pedestrian and cycling connectivity. T
August 28, 2014 Read time: 2 mins

Construction work on the fourth bridge spanning Chile’s Biobio Bridge is proceeding on schedule. The project site is located in Chile’s Gran Concepcion area. Construction could commence in 2016, with completion expected in 2018. Environmental studies have yet to be completed however. The work will be carried out as part of a concession package and the bridge is expected to cost some US$214 million to construct, carrying two lanes for vehicle traffic as well as claiming pedestrian and cycling connectivity. The design of the structure has yet to be finalised but the bridge itself will feature a 2.5km long section over the river, while the project length will be 6km due to the need to construct access roads. The new Biobio Bridge will be Chile’s longest, until the country’s Chacao Crossing is completed. The bridge is expected to carry a great deal of truck traffic between Talcahuano and Coronel and will be tolled, although Chile’s Truck Owner’s Association has complained that the projected tolls are now more costly than originally proposed. The northern access for the new bridge will be at the river mouth in Hualpen while to the south it will connect to the Los Batros Bridge in San Pedro de la Paz.

Related Content

  • More tenders for the Lower Thames Crossing
    April 2, 2021
    The winners will build 23km of road connecting to what will be the UK’s longest road tunnel.
  • Study for Colombia’s key city route
    October 6, 2016
    A feasibility study is underway for the highway project to connect Colombia’s capital Bogota with the country’s second city, Medellin. The 427km route will be of major benefit to the country by cutting journey times between the two cities to around five hours. However the project looks likely to face serious challenges, particularly with regard to the topography of key sections of the route. Tunnels may have to be constructed to avoid some of the steeper climbs on the current route. Widening the existing ro
  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.
  • Chile’s major bridge construction project
    April 25, 2017
    Planning work for Chile’s Chacao Bridge project is underway at present. The new suspension bridge will provide a link to Chiloe Island and will be the longest structure of its type in Latin America when complete. Because of the risk of major earthquakes in the area, the bridge has to be constructed to cope with substantial shocks. The project is being handled by the Consorcio Puente Chacao consortium and has been in the design phase since February 2014. Chile’s Ministry for Public Works wants to ensure that