Skip to main content

Project building new Biobio bridge in Chile on track

Construction work on the fourth bridge spanning Chile’s Biobio Bridge is proceeding on schedule. The project site is located in Chile’s Gran Concepcion area. Construction could commence in 2016, with completion expected in 2018. Environmental studies have yet to be completed however. The work will be carried out as part of a concession package and the bridge is expected to cost some US$214 million to construct, carrying two lanes for vehicle traffic as well as claiming pedestrian and cycling connectivity. T
August 28, 2014 Read time: 2 mins

Construction work on the fourth bridge spanning Chile’s Biobio Bridge is proceeding on schedule. The project site is located in Chile’s Gran Concepcion area. Construction could commence in 2016, with completion expected in 2018. Environmental studies have yet to be completed however. The work will be carried out as part of a concession package and the bridge is expected to cost some US$214 million to construct, carrying two lanes for vehicle traffic as well as claiming pedestrian and cycling connectivity. The design of the structure has yet to be finalised but the bridge itself will feature a 2.5km long section over the river, while the project length will be 6km due to the need to construct access roads. The new Biobio Bridge will be Chile’s longest, until the country’s Chacao Crossing is completed. The bridge is expected to carry a great deal of truck traffic between Talcahuano and Coronel and will be tolled, although Chile’s Truck Owner’s Association has complained that the projected tolls are now more costly than originally proposed. The northern access for the new bridge will be at the river mouth in Hualpen while to the south it will connect to the Los Batros Bridge in San Pedro de la Paz.

Related Content

  • Cost soars for Bangladesh’s Karnaphuli River Tunnel
    April 14, 2015
    Amid concern over cost rises, Bangladesh has issued a request for expression of interest to engage a consultant for the proposed the Karnaphuli River Tunnel. The estimated cost to build the Karnaphuli Tunnel has risen by US$205 million, according to the government’s Bridge Authority. A report in the Financial Express newspaper said the original 2km tunnel proposal was prepared two years ago based on a feasibility study. According to Bridge Authority officials, the cost to build the 3.4km tunnel has ri
  • Major new road and bridge projects underway in India
    December 22, 2016
    A series of major road and bridge projects is now underway in India. One of the most notable is the US$500 million project to build a new bridge spanning the River Ganges, which will be the longest in the country. Financing for the 9.8km bridge has been provided in the shape of a loan from the Asian Development Bank (ADB). The new link will be located close to Patna and is spanning both channels of the Ganges at this point and it features a cable-stayed design. The new bridge is required as the original str
  • Possible delays for Gordie Howe Bridge
    November 15, 2022
    The tolled six-lane cable-stayed bridge over the Detroit River will connect the city of Windsor in the Canadian province of Ontario with Detroit in the neighbouring US state of Michigan.
  • Peru’s Oyón -Ambo Highway presents challenges
    August 30, 2022
    Peru’s Oyón-Ambo highway project represents a landmark in construction for the country, while facing significant technical challenges – Paula Chapple, editor of Carreteras Pan-Americana (CPA), writes