Skip to main content

Progress on Serbia’s Zezeljev bridge replacement is slow

Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp
August 30, 2017 Read time: 2 mins

Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government.

Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported.

The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its campaign against Yugoslavia, of which Serbia was a member. The bridge was damaged first on 20 April 1999 and finally destroyed four days later, according to Edgar Martin, a waterways transportation consultant working in the Balkans.

Construction of the new bridge forms part of an 3287 EU strategy for the Danube Region. The replacement project was delayed initially because of work to remove wreckage of the old bridge in the Danube.

Completion of the bridge is not now likely to be in the spring of next year. Spanish company 5289 Azvi is the contractor and around €30 million of the estimated 60 million has been invested so far.

The minister also expressed concern over slow progress of works on Ub-Obrenovac part of the Corridor 11 motorway.

Serbia’s president Aleksandar Vucichas said he plans to visit the Surcin-Obrenovac section of Corridor 11. China Construction Communication Company began work on the 18km motorway in March 2017, with completion expected by the end of 2019. Value of works is estimated at €208 million, and is financed by China's Exim Bank, while Serbian roads company Putevi Srbije is the investor.

For more information on companies in this article

Related Content

  • Opening date for Romania's Brăila Bridge
    December 15, 2021
    The suspension bridge over the Danube River should be open by the end of next year.
  • Hyundai CE Europe opens new European HQ in Tessenderlo, Belgium
    October 13, 2017
    Hyundai Construction Equipment Europe, the Korean manufacturer’s newly independent business unit, has opened a €30 million European headquarters in Tessenderlo, Belgium. The official opening was attended by senior management from the Korean headquarters, government officials and European dealers. Tessenderlo, a town of around 19,000, lies about 70km east of the capital Brussels and in the Belgian province of Limburg.
  • Canada: work officially starts on Montreal’s Champlain Bridge
    June 25, 2015
    Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion. The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019. SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-
  • Montreal’s new Champlain Bridge is shaping up for Christmas
    September 10, 2018
    Montreal’s Champlain Bridges - one going up, one coming down, reports David Arminas The importance of the new Champlain Bridge to Montreal and Canada can’t be overstated, given the crumbling nature of the not-so-old original Champlain Bridge. The original steel truss affair across the St Lawrence River and the adjacent St Lawrence Seaway canal is “a lifeline for residents and businesses” in greater Montréal, according to the national Auditor General - the public sector spending watchdog. “It accommodates