Skip to main content

Priority Poland project for Portuguese firm

A high priority project in Poland will be handled by a Portuguese firm.
By MJ Woof February 16, 2021 Read time: 1 min
A key highway contract has been awarded in Poland for work to the S19 route – image courtesy of © Indos82, Dreamstime.com
An important road contract in Poland has been awarded to the Mota-Engil Central Europe subsidiary of Portuguese firm, Mota-Engil. The firm is to design and build a stretch of the S19 dual carriageway. The work will take around 36 months to carry out and the stretch of road will run from Lubartow to Lublin. The firm won the tender with a bid of €184.07 million, although there was a lower cost bid for the project. A number of other sections for the S19 were also awarded recently by Poland’s General Directorate for National Roads and Motorways (GDDKiA). Some 75km of the S19 has already been built, while work is underway at present on 257km of the route.

The project to build the S19 dual carriageway is important for Poland as well as its neighbours. Part of the Via Carpatia route, the road runs through Poland and proivdes an overland link from Lithuania to Greece. Intended for completion in 2025, the route will help improve international transport between North and South Europe. It will also provide a much-needed economic boost for Lithuania and Eastern Poland. The project has faced some controversy on environmental grounds, due to the cutting down of some forest areas and disturbance to the natural habitat of some threatened species.

For more information on companies in this article

Related Content

  • Polish programme of road development
    September 2, 2015
    A series of major road projects is now getting underway in Poland, while tenders for new projects are also opening. Estimates suggest that the construction of six new ring-roads in the Opolszczyzna region will cost some €356 million. These ring roads all form part of the 2014-2023 National Road Construction Programme. The first projects to be carried out will be for the ring-roads around Mysliny and Niemodlina. In all, the National Road Construction Programme will include the building of 57 ring-roads.
  • Poland awards three Expressway S19 sections
    March 11, 2017
    The Polish General Directorate for National Roads and Motorways – GDDKiA –reports that 14 bids have been received for construction of three sections of the S19 dual carriageway. A consortium formed by Pizzarotti and Fundamental Infrastructure pitched the lowest bid for the Krasnik Poludnie - Janow Lubelski Polnoc section, amounting to nearly €80 million. The lowest offer for the construction of the second section – a ring-road around the town of Janow Lubelski – was just over €34 million and made by M
  • Mostostal Warszawa picked for S19 segment
    August 11, 2022
    The contract in northern Poland is worth around €211 million.
  • New Polish road projects planned
    March 19, 2021
    New Polish road projects are now being planned.