Skip to main content

Prague wins legal battle over Blanka Tunnel costs

The Czech capital Prague will not have to pay €63 million to construction firm CKD Praha DIZ for cost overruns on the Blanka Tunnel complex. CKD Praha DIZ sought the amount over an alleged rise in costs when completion of the tunnel was delayed, according to a report by Radio Praha.
September 6, 2016 Read time: 2 mins

The Czech capital Prague will not have to pay €63 million to construction firm CKD Praha DIZ for cost overruns on the Blanka Tunnel complex.

CKD Praha DIZ sought the amount over an alleged rise in costs when completion of the tunnel was delayed, according to a report by Radio Praha.

A court of arbitration also ruled that the company must pay the city’s legal costs of around €630,000. The court’s decisions are binding and final.

The 6.4km Blanka Tunnel complex is a part of Prague’s unfinished ring road system and is the longest road tunnel in the Czech Republic and the longest city tunnel in Europe. Just under 40km of the 83km Ring Road are complete.

The tunnel, which connects the area west of Prague Castle with Trója district in the northeast, consists of three tunnels - Bubenečský, Dejvický and Brusnický. Construction started in 2006 and completion was supposed to be 2011.

However, delays put the opening date back to September last year and doubled the overall cost to around €1.6 billion.

A survey by Prague’s Technical Administration of Roadways recently found that on averages 75,000 vehicles use the Blanka tunnel daily.

Related Content

  • Let’s Boogie in a new tunnel
    July 7, 2020
    The new Victory Boogie Woogie Tunnel will be the most sustainable tunnel in the Netherlands.
  • BAM wins motorway deals in The Hague and Munich
    December 7, 2015
    The Dutch city of The Hague has awarded a BAM joint venture with a €300 million design, construction and maintenance contract for a 4km city road. The new connecting road will run between the motorway at the Ypenburg interchange, A4 and A13, and The Hague’s Central Zone of Binckhorst-Centrum-Scheveningen. Construction will start in mid-2016 and the road is expected to be open by early 2020. The Rotterdamsebaan will make The Hague and its immediate region better accessible by connecting the A4 /A13
  • Faroes’ Streymoy-to-Sandoy Tunnel opens
    January 23, 2024
    The 10.8km-long Sandoy Tunnel connecting the islands of Streymoy and Sandoy opened in mid-December and is the longest subsea tunnel in the Faroe Islands.
  • Lower Thames Crossing gets green light
    March 26, 2025
    The 14.5-mile project near London will include a 2.6-mile tunnel under the Thames River and come at a cost of around £8.3 billion.