Skip to main content

Prague wins legal battle over Blanka Tunnel costs

The Czech capital Prague will not have to pay €63 million to construction firm CKD Praha DIZ for cost overruns on the Blanka Tunnel complex. CKD Praha DIZ sought the amount over an alleged rise in costs when completion of the tunnel was delayed, according to a report by Radio Praha.
September 6, 2016 Read time: 2 mins

The Czech capital Prague will not have to pay €63 million to construction firm CKD Praha DIZ for cost overruns on the Blanka Tunnel complex.

CKD Praha DIZ sought the amount over an alleged rise in costs when completion of the tunnel was delayed, according to a report by Radio Praha.

A court of arbitration also ruled that the company must pay the city’s legal costs of around €630,000. The court’s decisions are binding and final.

The 6.4km Blanka Tunnel complex is a part of Prague’s unfinished ring road system and is the longest road tunnel in the Czech Republic and the longest city tunnel in Europe. Just under 40km of the 83km Ring Road are complete.

The tunnel, which connects the area west of Prague Castle with Trója district in the northeast, consists of three tunnels - Bubenečský, Dejvický and Brusnický. Construction started in 2006 and completion was supposed to be 2011.

However, delays put the opening date back to September last year and doubled the overall cost to around €1.6 billion.

A survey by Prague’s Technical Administration of Roadways recently found that on averages 75,000 vehicles use the Blanka tunnel daily.

Related Content

  • Eurobitume Congress: Prague promises
    June 22, 2016
    Held every four years, the Eurasphalt and Eurobitume congresses have a reputation for revealing developments that will shape the future of bitumen use on Europe’s roads. This year’s event in Prague promises to uphold that reputation. By Kristina Smith The list of locations for the Eurobitume and Eurasphalt (E&E) Congresses reads like a traveller’s dream itinerary: Strasbourg, Barcelona, Vienna, Copenhagen, Istanbul. Now the beautiful city of Prague has been added to the list. Between 1-3 June, presenter
  • State of the art tunnel a conservation triumph
    May 2, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • State of the art tunnel a conservation triumph
    February 28, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • Mott MacDonald to design highway improvements in Czech Republic
    August 6, 2015
    Mott MacDonald has been appointed by the Road and Motorway Directorate of the Czech Republic to design sections of the R35 and R55 expressways. R35 connects the Bohemia and Moravia regions and runs parallel to the D1 motorway, the longest in the country. Mott MacDonald will design a 5.8km section of the expressway, including three bridges, two interchanges, two roundabouts, four overpasses and one railway viaduct. One watercourse will also be relocated as part of the scheme.