Skip to main content

Prague to replace the 90-year-old Liben Bridge

The Czech capital Prague will replace the deteriorating 90-year-old Liben Bridge at a cost of more than €20 million. The 370m-long bridge over the River Vlatava connects the city quarters of Holešovice and Libeň. It was closed to traffic for several weeks earlier this year for emergency but temporary repairs, according to Prague media. Replacement will include a similarly long bridge plus 400m of roads on either bank of the river but be built on the existing bridge piers. Like the old bridge , it will
May 8, 2018 Read time: 2 mins

The Czech capital Prague will replace the deteriorating 90-year-old Liben Bridge at a cost of more than €20 million.

The 370m-long bridge over the River Vlatava connects the city quarters of Holešovice and Libeň. It was closed to traffic for several weeks earlier this year for emergency but temporary repairs, according to Prague media.

Replacement will include a similarly long bridge plus 400m of roads on either bank of the river but be built on the existing bridge piers. Like the old bridge , it will have tram lines as well as bike lanes.

The old Liben Bridge is 21m wide and has five arches with spans between 28-43m. It replaced a temporary wooden bridge when it was opened in 1928 to celebrate the tenth anniversary of the existence of Czechoslovakia.

Deputy mayor Petr Dolinek has said that the contract for the new bridge would be a fixed price deal to avoid the cost rises.

But demolition of the old bridge, however, is proving controversial among environmentalists, historians, many city councillors and the local population because of its cultural significance.

Related Content

  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th
  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th
  • “Structurally deficient” US bridges need warning signs, says ARTBA
    April 10, 2015
    A US construction sector group wants warning signs to be posted on bridges designated “structurally deficient" and in need of repair by state engineers. More than 61,000 structurally deficient bridges remain in need of significant repair, according to the American Road & Transportation Builders Association (ARTBA), which analysed the US Department of Transport’s National Bridge Inventory database. However, by the end of 2014 there were more than 2,000 fewer structurally deficient structures than in 20
  • Webuild proposes Baltimore Bridge design
    May 6, 2024
    VIDEO: The project in the US state of Maryland to replace the collapsed Francis Scott Key Bridge was made free of charge ahead of tomorrow’s state-led virtual industry forum for reconstruction of the bridge.