Skip to main content

Prague to replace the 90-year-old Liben Bridge

The Czech capital Prague will replace the deteriorating 90-year-old Liben Bridge at a cost of more than €20 million. The 370m-long bridge over the River Vlatava connects the city quarters of Holešovice and Libeň. It was closed to traffic for several weeks earlier this year for emergency but temporary repairs, according to Prague media. Replacement will include a similarly long bridge plus 400m of roads on either bank of the river but be built on the existing bridge piers. Like the old bridge , it will
May 8, 2018 Read time: 2 mins

The Czech capital Prague will replace the deteriorating 90-year-old Liben Bridge at a cost of more than €20 million.

The 370m-long bridge over the River Vlatava connects the city quarters of Holešovice and Libeň. It was closed to traffic for several weeks earlier this year for emergency but temporary repairs, according to Prague media.

Replacement will include a similarly long bridge plus 400m of roads on either bank of the river but be built on the existing bridge piers. Like the old bridge , it will have tram lines as well as bike lanes.

The old Liben Bridge is 21m wide and has five arches with spans between 28-43m. It replaced a temporary wooden bridge when it was opened in 1928 to celebrate the tenth anniversary of the existence of Czechoslovakia.

Deputy mayor Petr Dolinek has said that the contract for the new bridge would be a fixed price deal to avoid the cost rises.

But demolition of the old bridge, however, is proving controversial among environmentalists, historians, many city councillors and the local population because of its cultural significance.

Related Content

  • Messina Strait bridge tender due?
    August 10, 2023
    The Messina Strait bridge tender is due to open soon.
  • Cleveland Bridge: monuments of culture, bridges that define
    July 2, 2021
    Bridges – many designed and renovated by Cleveland Bridge – are part of a city’s architectural landscape. They help define an urban area’s identity, as Carlos Arias*, the company’s international manager, explains in this special feature.
  • Bridge demolition easier with modern machines
    February 23, 2012
    The speedy and safe removal of old or unwanted structures is made easier with modern, sophisticated equipment, Patrick Smith reports. The power and versatility of modern demolition tools and machines was demonstrated when a bridge was removed overnight as part of a motorway widening project.
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci