Skip to main content

Prague to replace the 90-year-old Liben Bridge

The Czech capital Prague will replace the deteriorating 90-year-old Liben Bridge at a cost of more than €20 million. The 370m-long bridge over the River Vlatava connects the city quarters of Holešovice and Libeň. It was closed to traffic for several weeks earlier this year for emergency but temporary repairs, according to Prague media. Replacement will include a similarly long bridge plus 400m of roads on either bank of the river but be built on the existing bridge piers. Like the old bridge , it will
May 8, 2018 Read time: 2 mins

The Czech capital Prague will replace the deteriorating 90-year-old Liben Bridge at a cost of more than €20 million.

The 370m-long bridge over the River Vlatava connects the city quarters of Holešovice and Libeň. It was closed to traffic for several weeks earlier this year for emergency but temporary repairs, according to Prague media.

Replacement will include a similarly long bridge plus 400m of roads on either bank of the river but be built on the existing bridge piers. Like the old bridge , it will have tram lines as well as bike lanes.

The old Liben Bridge is 21m wide and has five arches with spans between 28-43m. It replaced a temporary wooden bridge when it was opened in 1928 to celebrate the tenth anniversary of the existence of Czechoslovakia.

Deputy mayor Petr Dolinek has said that the contract for the new bridge would be a fixed price deal to avoid the cost rises.

But demolition of the old bridge, however, is proving controversial among environmentalists, historians, many city councillors and the local population because of its cultural significance.

Related Content

  • Resilient roads: cooperation is key
    June 14, 2021
    Now is the time for national road agencies and the private sector to cooperate on building more climate resilient roads, urges Dr Erik Denneman
  • Wacker Neuson bullish with strong results
    May 8, 2019
    The Wacker Neuson Group reports a strong financial performance for the first quarter of 2019. The firm’s results reveal a double-digit rise in revenue to €434.6 million, a gain of 17%. The company saw even higher growth of profit before interest and tax (EBIT) growth to reach €30.2 million, a jump of 31%. Meanwhile the firm’s EBIT margin improved to 6.9%, a gain of 0.7%. “This strong start to the year sees us continue the dynamic pace of growth from the fourth quarter of 2018. Demand for our products and
  • Hoover Dam’s innovative new bridge bypass
    April 12, 2013
    Soaring over 271m above the Colorado River, the Hoover Dam Bypass overlooks one of America’s greatest icons and assets. The October 2010 opening of the bypass improves the security of the historic Hoover Dam by removing through traffic from US Route 93. This has reduced its vulnerability to a terrorist attack against an international landmark and guarded the most sustainable source of electricity and the scarce water supply for the entire southwestern United States. By diverting traffic from the hairpin tur
  • Using ITS to maximise safety and traffic flow for cycling
    January 22, 2013
    Copenhagen, Denmark, has long been known as one of the world’s leading cities for cycling. In some areas of the city, the modal share of bikes has reached a level of as much as 50 %. And on some of the most frequently used bike paths the average daily number of cyclists is close to 30,000. As these numbers continue to rise, new ways of planning and implementing cycling infrastructure are needed. Increasingly, Danish traffic planners are turning to technology as a tool for planning cycling infrastructure. I