Skip to main content

Prague to replace the 90-year-old Liben Bridge

The Czech capital Prague will replace the deteriorating 90-year-old Liben Bridge at a cost of more than €20 million. The 370m-long bridge over the River Vlatava connects the city quarters of Holešovice and Libeň. It was closed to traffic for several weeks earlier this year for emergency but temporary repairs, according to Prague media. Replacement will include a similarly long bridge plus 400m of roads on either bank of the river but be built on the existing bridge piers. Like the old bridge , it will
May 8, 2018 Read time: 2 mins

The Czech capital Prague will replace the deteriorating 90-year-old Liben Bridge at a cost of more than €20 million.

The 370m-long bridge over the River Vlatava connects the city quarters of Holešovice and Libeň. It was closed to traffic for several weeks earlier this year for emergency but temporary repairs, according to Prague media.

Replacement will include a similarly long bridge plus 400m of roads on either bank of the river but be built on the existing bridge piers. Like the old bridge , it will have tram lines as well as bike lanes.

The old Liben Bridge is 21m wide and has five arches with spans between 28-43m. It replaced a temporary wooden bridge when it was opened in 1928 to celebrate the tenth anniversary of the existence of Czechoslovakia.

Deputy mayor Petr Dolinek has said that the contract for the new bridge would be a fixed price deal to avoid the cost rises.

But demolition of the old bridge, however, is proving controversial among environmentalists, historians, many city councillors and the local population because of its cultural significance.

Related Content

  • Italy’s proposed €13.5 billion bridge project
    June 17, 2025
    Italy is again proposing the €13.5 billion bridge project to span the Messina Strait.
  • A thousand birthday greetings for US-Canada Thousand Island Bridge
    August 21, 2018
    The Canada-US Thousand Island Bridge system celebrated its 80th birthday in August with presentations and an open house at its US headquarters. The 33.7km three-bridge system over the St Lawrence River took 16 months to build and was completed 10 weeks ahead of schedule. It runs from Collins Landing near Alexandria Bay in the US state of New York to the small town of Ivy Lea in the Canadian province of Ontario. The system connects US Interstate 81 and Canada’s Highway 401, a major motorway between Montre
  • S&P Global Rating: credit stability for toll road operators
    August 14, 2017
    The outlook is generally stable for business conditions and credit quality for toll roads worldwide, according to the latest survey from ratings agency S&P Global.The exception is the US where the overall outlook is “positive”, noted the report S&P Global Ratings' 2017. The 21-page report considers broad economic and industry-specific trends. It looks at economic conditions, demographic trends and geopolitical risks that affect the movement of people and goods. “We expect stable or improving, but still frag
  • Highway developments to boost east-west transport
    February 16, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports