Skip to main content

Prague to renovate the old Liben Bridge

The Czech capital Prague has cancelled a contract worth almost US$90 million to demolish old the Liben Bridge and build a replacement. Instead, it will spend nearly $22 million to renovate and strengthen the existing bridge - Libensky Most . Media reported that the bridge will have its frame replaced and will be strengthened during the renovation, following recommendations from the Czech Technical University's Klokner Institute. Renovating the bridge will likely take around two years. The Libeň Bri
May 7, 2019 Read time: 1 min
The Czech capital Prague has cancelled a contract worth almost US$90 million to demolish old the Liben Bridge and build a replacement.


Instead, it will spend nearly $22 million to renovate and strengthen the existing bridge - Libensky Most .

Media reported that the bridge will have its frame replaced and will be strengthened during the renovation, following recommendations from the Czech Technical University's Klokner Institute. Renovating the bridge will likely take around two years.

The Libeň Bridge, opened in 1928,  is 37m long - the longest bridge in Prague.  Its wide is 21 metres and the tram line is a part of the bridge since its opening.  It has five arches with the spans between 28 and 43m. It replaced a temporary wooden bridge which had been around since 1903.

The bridge was slightly damaged by a flood in 2002. In 2016, a study by the university stated that the bridge needed restoration.

Related Content

  • Recession impact report on worldwide infrastructure spending
    May 10, 2012
    A new report examines how aggressive government belt-tightening and financial market deleveraging restrained worldwide infrastructure investments for 2012 and probably for the next five years. In the US, for instance, Infrastructure2012: Spotlight on Leadership, released by the Urban Land Institute (ULI) and Ernst & Young, says that constrained public budgets and a growing recognition at the local level of the importance of infrastructure, combined with lack of action at the federal level, are causing state
  • Bavarian Autobahn bridge repairs
    March 11, 2019
    Austrian contractor STRABAG is heading a consortium that will carry out bridge upgrades on the busy A9 Autobahn connecting Nuremburg with Munich in Bavaria, southern Germany. The eight bridges between the Nuremburg/Feucht interchange and the Hipoltstein junction will be demolished and replaced with new structures. The deal is worth € 38 million and will be handled by the consortium comprising STRABAG, subdivision Bavaria North, and Ed Züblin, Subdivision Bridge Construction. The client for the project is Au
  • Environmentally friendly demolition of famous US Bay Bridge to take years
    March 18, 2013
    While the new eastern span of northern California’s Bay Bridge between San Francisco and Oakland will open to traffic this September, the task of taking down the old eastern bridge span roadway is likely to take years. Speaking to a local TV station Brad McCrea, regulatory director of the Bay Conservation and Development Commission, the state agency that oversees protection of the Bay Area, said: “Taking the old Bay Bridge [eastern span roadway] down is as practically as big a project as putting the new one
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia