Skip to main content

Prague to renovate the old Liben Bridge

The Czech capital Prague has cancelled a contract worth almost US$90 million to demolish old the Liben Bridge and build a replacement. Instead, it will spend nearly $22 million to renovate and strengthen the existing bridge - Libensky Most . Media reported that the bridge will have its frame replaced and will be strengthened during the renovation, following recommendations from the Czech Technical University's Klokner Institute. Renovating the bridge will likely take around two years. The Libeň Bri
May 7, 2019 Read time: 1 min
The Czech capital Prague has cancelled a contract worth almost US$90 million to demolish old the Liben Bridge and build a replacement.


Instead, it will spend nearly $22 million to renovate and strengthen the existing bridge - Libensky Most .

Media reported that the bridge will have its frame replaced and will be strengthened during the renovation, following recommendations from the Czech Technical University's Klokner Institute. Renovating the bridge will likely take around two years.

The Libeň Bridge, opened in 1928,  is 37m long - the longest bridge in Prague.  Its wide is 21 metres and the tram line is a part of the bridge since its opening.  It has five arches with the spans between 28 and 43m. It replaced a temporary wooden bridge which had been around since 1903.

The bridge was slightly damaged by a flood in 2002. In 2016, a study by the university stated that the bridge needed restoration.

Related Content

  • Heavy going for heavy loads in Canada’s Alberta province
    January 9, 2019
    Canada’s Alberta province is considering a US$1.2 billion upgrade to its High Load Corridor that recently saw transportation of an 820 tonne petrochemical pipe. The 96m long tower – equivalent to a football pitch in length and about two lanes wide - was made in the capital city Edmonton, loaded onto a special trucking unit and driven the 38km to Fort Saskatchewan, mostly along provincial Highway 14 and then 21. The journey took four days and the tower, a polypropylene-propane splitter - will be instal
  • Kenya rehabilitates, widens, tolls Northern Corridor
    November 8, 2017
    A massive highway project in Kenya will boost transport for the country as well as its neighbours - Shem Oirere reports. Kenya has commenced the process of rehabilitating, expanding and tolling of 657km of East Africa’s Northern Corridor that is anchored on the Indian Ocean port of Mombasa and which links the gateway with landlocked countries of Uganda, Rwanda, Burundi and parts of eastern Democratic Republic of Congo (DRC).
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of
  • Another bridge over the River Drina
    October 29, 2020
    Cost of the two-lane bridge between Bosnia and Serbia is reportedly around €13 million.