Skip to main content

Prague to renovate the old Liben Bridge

The Czech capital Prague has cancelled a contract worth almost US$90 million to demolish old the Liben Bridge and build a replacement. Instead, it will spend nearly $22 million to renovate and strengthen the existing bridge - Libensky Most . Media reported that the bridge will have its frame replaced and will be strengthened during the renovation, following recommendations from the Czech Technical University's Klokner Institute. Renovating the bridge will likely take around two years. The Libeň Bri
May 7, 2019 Read time: 1 min
The Czech capital Prague has cancelled a contract worth almost US$90 million to demolish old the Liben Bridge and build a replacement.


Instead, it will spend nearly $22 million to renovate and strengthen the existing bridge - Libensky Most .

Media reported that the bridge will have its frame replaced and will be strengthened during the renovation, following recommendations from the Czech Technical University's Klokner Institute. Renovating the bridge will likely take around two years.

The Libeň Bridge, opened in 1928,  is 37m long - the longest bridge in Prague.  Its wide is 21 metres and the tram line is a part of the bridge since its opening.  It has five arches with the spans between 28 and 43m. It replaced a temporary wooden bridge which had been around since 1903.

The bridge was slightly damaged by a flood in 2002. In 2016, a study by the university stated that the bridge needed restoration.

Related Content

  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Geosynthetic drainage technology developments
    June 13, 2012
    An innovative solution to providing vital, low-impact surface water control for one of Britain’s largest local authority road schemes is said to have been recently achieved using Hydro International’s (HI) Hydro Vortex Drop Shaft  ow control technology. The new 7km bypass built by Costain at Church Village, near Pontypridd, South Wales, required careful planning to minimise its effect on the countryside and the local environment. Rhondda Cynon Taff Council needed to bypass Church Village to reduce traf c
  • The Lessons of the Genoa bridge collapse
    April 23, 2019
    The partial collapse of the Polcevera viaduct, better known as the Morandi Bridge, has prompted debate regarding the technical and administrative aspects of maintaining road infrastructures. We discussed it with the engineer Gabriele Camomilla, former Director of Research and Maintenance of the Società Autostrade, who coordinated the only major structural intervention performed on the bridge, carried out in the early 1990s
  • Pocitelj Bridge reaches banks of Neretva River
    August 21, 2023
    Contractors are working to correct a concrete issue on a section of the 100m-long continuous prestressed girder bridge across the Neretva River in Bosnia and Herzegovina.