Skip to main content

Prague to renovate the old Liben Bridge

The Czech capital Prague has cancelled a contract worth almost US$90 million to demolish old the Liben Bridge and build a replacement. Instead, it will spend nearly $22 million to renovate and strengthen the existing bridge - Libensky Most . Media reported that the bridge will have its frame replaced and will be strengthened during the renovation, following recommendations from the Czech Technical University's Klokner Institute. Renovating the bridge will likely take around two years. The Libeň Bri
May 7, 2019 Read time: 1 min
The Czech capital Prague has cancelled a contract worth almost US$90 million to demolish old the Liben Bridge and build a replacement.


Instead, it will spend nearly $22 million to renovate and strengthen the existing bridge - Libensky Most .

Media reported that the bridge will have its frame replaced and will be strengthened during the renovation, following recommendations from the Czech Technical University's Klokner Institute. Renovating the bridge will likely take around two years.

The Libeň Bridge, opened in 1928,  is 37m long - the longest bridge in Prague.  Its wide is 21 metres and the tram line is a part of the bridge since its opening.  It has five arches with the spans between 28 and 43m. It replaced a temporary wooden bridge which had been around since 1903.

The bridge was slightly damaged by a flood in 2002. In 2016, a study by the university stated that the bridge needed restoration.

Related Content

  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • More Norway wooden bridges to open
    February 6, 2023
    Statens Vegvesen is working to solve the challenges related to the bridges that are still closed after the collapse of a bridge in Tretten last August.
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Temporary bridges after Tretten collapse
    August 22, 2022
    The 150m-long, 10m-wide Tretten Bridge - only a decade old - broke in two, collapsing into the river stranding two vehicles and their occupants.