Skip to main content

PPP project planned for Aruba

The Government in Aruba in the Caribbean is giving its approval for its second PPP transport infrastructure project, the Watty Vos Boulevard. The start of the tender process for the project is planned for the first quarter of 2014. PwC is the transaction advisor for the Contracting Authority, while the Dutch Ministry of Infrastructure and local legal firm Sjiem Fat & Co are also part of the team. The project will cost some US$120 million and involves the construction of a new arterial road 2x2 around Oranje
November 29, 2013 Read time: 2 mins
The Government in Aruba in the Caribbean is giving its approval for its second PPP transport infrastructure project, the Watty Vos Boulevard. The start of the tender process for the project is planned for the first quarter of 2014. PwC is the transaction advisor for the Contracting Authority, while the Dutch Ministry of Infrastructure and local legal firm Sjiem Fat & Co are also part of the team. The project will cost some US$120 million and involves the construction of a new arterial road 2x2 around Oranjestad between intersection Sabana Blanco and the Punta Brabo intersection. This route begins at the existing Sabana Blanco roundabout via through the neighborhoods of Meiveld, San Barbola, Sero Patrishi, Tanki Leendert, Ponton and Bushiri to the intersection of Punta Brabo. The existing lanes from intersection Punta Brabo through J E Irausquin Boulevard to the Westin Hotel, part of the L.G. Smith Boulevard, Caya Punta Brabo, Dr Horacio E Oduber Boulevard and a part of the route Ponton - Noord will be reconstructed. In total, this involves the construction of around 7km, renovation of the existing road over a length of about 17km in which 13 existing intersections will be reconstructed and 2 overpasses will be built. Furthermore, a bike road of approximately 17km will be built along the entire Watty Vos Boulevard route and low-rise beach area.

Construction period of the above is estimated no more than 30 months. The contractor is also responsible for the maintenance of the Watty Vos Boulevard project during the period from the commencement date until 20 years after the completion of the construction project.

Related Content

  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Pakistan’s new Karachi-Hyderabad highway
    September 23, 2024
    Pakistan is planning a new Karachi-Hyderabad highway
  • Taiwan bridge link project moving ahead
    February 23, 2017
    Construction of the Kinmen Bridge in Taiwan has now been resumed, with work having restarted on the project in late 2016. The bridge will be 5.4km long in all and will have a 1.05km long main section, connecting the islands of Greater Kinmen and Little Kinmen (also known as Lieyu). The project includes building approach roads for the bridge as well as cuttings and connecting ramps. Costing US$292 million and with funding being provided jointly by Taiwan’s Government and the local authorities, the bridge is
  • Indonesia set for major PPP infrastructure tendering round
    March 10, 2015
    The Indonesian government is getting ready to tender for major infrastructure projects including roads to be developed under public-private partnership (PPP) contracts, the Jakarta Post reported. Public Works and Public Housing minister Basuki Hadimuljono said in Jakarta that the first priorities would be on the 94km Balikpapan-Samarinda toll road, the 7km Manado-Bitung toll road in North Sulawesi and a drinking water treatment system project in western Semarang, central Java. The projects will prove that P