Skip to main content

PPP project planned for Aruba

The Government in Aruba in the Caribbean is giving its approval for its second PPP transport infrastructure project, the Watty Vos Boulevard. The start of the tender process for the project is planned for the first quarter of 2014. PwC is the transaction advisor for the Contracting Authority, while the Dutch Ministry of Infrastructure and local legal firm Sjiem Fat & Co are also part of the team. The project will cost some US$120 million and involves the construction of a new arterial road 2x2 around Oranje
November 29, 2013 Read time: 2 mins
The Government in Aruba in the Caribbean is giving its approval for its second PPP transport infrastructure project, the Watty Vos Boulevard. The start of the tender process for the project is planned for the first quarter of 2014. PwC is the transaction advisor for the Contracting Authority, while the Dutch Ministry of Infrastructure and local legal firm Sjiem Fat & Co are also part of the team. The project will cost some US$120 million and involves the construction of a new arterial road 2x2 around Oranjestad between intersection Sabana Blanco and the Punta Brabo intersection. This route begins at the existing Sabana Blanco roundabout via through the neighborhoods of Meiveld, San Barbola, Sero Patrishi, Tanki Leendert, Ponton and Bushiri to the intersection of Punta Brabo. The existing lanes from intersection Punta Brabo through J E Irausquin Boulevard to the Westin Hotel, part of the L.G. Smith Boulevard, Caya Punta Brabo, Dr Horacio E Oduber Boulevard and a part of the route Ponton - Noord will be reconstructed. In total, this involves the construction of around 7km, renovation of the existing road over a length of about 17km in which 13 existing intersections will be reconstructed and 2 overpasses will be built. Furthermore, a bike road of approximately 17km will be built along the entire Watty Vos Boulevard route and low-rise beach area.

Construction period of the above is estimated no more than 30 months. The contractor is also responsible for the maintenance of the Watty Vos Boulevard project during the period from the commencement date until 20 years after the completion of the construction project.

Related Content

  • TRA 2014 showcases the best of cutting-edge transport research and thinking
    July 1, 2014
    Despite tight finances due to the current global economic climate, the recent Transport Research Arena (TRA) 2014 show in Paris showed how innovative transport research, largely using cutting-edge ITS, is creating safer and smarter highways of the future. Guy Woodford reports How far can you drive around a car race track with no other vehicles on it on half a glass of fuel while attempting to maintain a speed of 60kph? After taking up the challenge offered by the Eco Driving Simulator using SiVIC (Simulatio
  • Bolivia’s new highway
    October 10, 2017
    Bolivia’s new highway will provide better access into mountain areas – Mauro Nogarin writes At the beginning of 2015, work began on the construction and paving for the Tupiza - Atocha - Uyuni highway project. The route is located in Bolivia’s Potosí department: it is 189m in length and forms part of the Southwest Basic Road Network (RVF) of Bolivia. The completion of this important route is requiring funding worth US$150 million, of which 72% is being delivered through loans from the European Investment
  • Upgrade for Scottish road
    February 17, 2012
    Work is progressing on a £320 million (e385 million) project to upgrade a busy 18km stretch of the main A80 Glasgow-Stirling road in Scotland to motorway standard. The project, between the villages of Stepps and Haggs, is part of a massive infrastructure investment in Scotland's transport network, and construction work includes almost 8km of new dual-lane motorway and hard shoulders between
  • Massey Tunnel project to be Design-Build-Finance-Operate-Maintain
    January 25, 2016
    The provincial British Columbia government in western Canada has chosen a Design-Build-Finance-Operate-Maintain (DBFOM) procurement model for the Vancouver region’s 10-lane bridge replacement for the ageing Massey Tunnel. The US$2.5 billion project includes a bridge and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day and is often congested during rush hours.