Skip to main content

PPP project planned for Aruba

The Government in Aruba in the Caribbean is giving its approval for its second PPP transport infrastructure project, the Watty Vos Boulevard. The start of the tender process for the project is planned for the first quarter of 2014. PwC is the transaction advisor for the Contracting Authority, while the Dutch Ministry of Infrastructure and local legal firm Sjiem Fat & Co are also part of the team. The project will cost some US$120 million and involves the construction of a new arterial road 2x2 around Oranje
November 29, 2013 Read time: 2 mins
The Government in Aruba in the Caribbean is giving its approval for its second PPP transport infrastructure project, the Watty Vos Boulevard. The start of the tender process for the project is planned for the first quarter of 2014. PwC is the transaction advisor for the Contracting Authority, while the Dutch Ministry of Infrastructure and local legal firm Sjiem Fat & Co are also part of the team. The project will cost some US$120 million and involves the construction of a new arterial road 2x2 around Oranjestad between intersection Sabana Blanco and the Punta Brabo intersection. This route begins at the existing Sabana Blanco roundabout via through the neighborhoods of Meiveld, San Barbola, Sero Patrishi, Tanki Leendert, Ponton and Bushiri to the intersection of Punta Brabo. The existing lanes from intersection Punta Brabo through J E Irausquin Boulevard to the Westin Hotel, part of the L.G. Smith Boulevard, Caya Punta Brabo, Dr Horacio E Oduber Boulevard and a part of the route Ponton - Noord will be reconstructed. In total, this involves the construction of around 7km, renovation of the existing road over a length of about 17km in which 13 existing intersections will be reconstructed and 2 overpasses will be built. Furthermore, a bike road of approximately 17km will be built along the entire Watty Vos Boulevard route and low-rise beach area.

Construction period of the above is estimated no more than 30 months. The contractor is also responsible for the maintenance of the Watty Vos Boulevard project during the period from the commencement date until 20 years after the completion of the construction project.

Related Content

  • Let’s Boogie in a new tunnel
    July 7, 2020
    The new Victory Boogie Woogie Tunnel will be the most sustainable tunnel in the Netherlands.
  • Traffic management drives sustainability
    June 18, 2012
    New initiatives could boost transport sustainability – David Crawford writes. New roles are opening up for urban traffic management systems in helping city authorities to meet increasingly stringent governmental and supra-governmental air quality standards. European local authorities are typically tasked with both traffic management and pollution monitoring within their areas, making them well placed to draw on the latter to mitigate the impacts of the former.
  • Congestion and safety concerns over Serbia’s roads
    February 23, 2012
    With traffic flows on the increase, Serbia needs to improve its road network and safety record, reports Gordon Feller. Serbia's road network needs to upgrade its road system against the backdrop of increased traffic flows. Serbia is crossed by segments of the important Trans European network (TEN). Corridor X with its branches Xb (Belgrade-Budapest) Xc (Nis-Sofia), and Xd (Nis-Presevo), represent the most important transit routes in the Republic, connecting Austria/Hungary, Slovenia/Croatia, and Bulgaria/Ma
  • Jacobs and CH2M to merge in a US$3.27 deal
    August 3, 2017
    Global US infrastructure firm Jacobs Engineering Group and one of its main rivals, CH2M, are to merge under a US$3.27 billion deal. In a written statement, Jacobs said it will acquire all of the outstanding shares of CH2M in a cash and stock transaction, including around $416 million of CH2M debt. CH2M had global revenue in the past 12 months of around $4.4 billion and about 20,000 employees. Its contracts are in the water, transportation, environmental and nuclear sectors.