Skip to main content

Polish road project – bids submitted

Bids have now been submitted for a key Polish road project.
By MJ Woof September 29, 2020 Read time: 1 min
Bidding is complete for an important dual carriageway project in Poland - image courtesy © Bigandt, Dreamstime.com
The bidding stage for the S19 road project in Poland is now being completed. The local contractor, Budimex, submitted the leading bid for the project.

The new dual carriageway will connect Bialystok Zachod with Bialystok Ksiezno junction. Budimex made a bid of close to €109 million for the work.

Related Content

  • Redevelopments at southern Polish airports
    August 21, 2013
    Rzeszów-Jasionka Airport in the south-east of Poland is now benefiting from a new taxiway constructed over a 50-month period and costing some €22.5 million. The work was required as the airport needs to increase capacity to cope with growing passenger traffic. The main portion of the project was for the construction of a 3km long taxiway, which lies parallel to the airport’s main runway. This taxiway now allows aircraft to manoeuvre away from the single runway and free up capacity for take-offs and land
  • VIDEO: M6 motorway link taking shape between Knutsford and Bowdon
    August 23, 2016
    In the UK, work to connect sections of the new €223 million A556 Knutsford to Bowdon dual carriageway, between the M6 and M56 in Cheshire, will get underway in earnest at the weekend with the opening of its first bridge.

    The route of the road, forming a link between junction 19 of the M6 motorway at Knutsford and junction 7 of the M56 motorway at Bowdon, has been taking shape for some time.
     
  • Bridges in Sunderland and Poland are being slid into place
    February 6, 2017
    Sunderland sees a bridge slide into place and two bridges inch their way across a Polish highway Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation likely to take place next year. The project to build the New Wear Crossing is now halfway through with the first half of the steel deck b
  • Hungarian bypass contract for STRABAG
    September 14, 2021
    STRABAG has been awarded a major Hungarian bypass contract.