Skip to main content

Polish road project – bids submitted

Bids have now been submitted for a key Polish road project.
By MJ Woof September 29, 2020 Read time: 1 min
Bidding is complete for an important dual carriageway project in Poland - image courtesy © Bigandt, Dreamstime.com
The bidding stage for the S19 road project in Poland is now being completed. The local contractor, Budimex, submitted the leading bid for the project.

The new dual carriageway will connect Bialystok Zachod with Bialystok Ksiezno junction. Budimex made a bid of close to €109 million for the work.

Related Content

  • Mobile grouting trailers for soil nail rigs
    February 7, 2012
    Geotechnical specialists, Bachy Soletanche and Carillion Piling are currently working on an £18 million (e21 million) geotechnical contract as part of carriageway improvements on the M1 motorway to the north of London, England. The work between junctions 10-13, Luton to Milton Keynes, is being carried out for the Costain Carillion joint venture working on behalf of the Highways Agency. The piling and soil nailing works are to facilitate the conversion of the current hard shoulder to a peak-time running lane
  • Contract for major Colombia tunnel project
    September 2, 2015
    Bidding has been closed for the contract to construct the Toyo Tunnel in Colombia. Three offers for the project have been made. In all, eight firms are participating in the tendering, with six of the companies being from Colombia itself. The project is expected to cost some US$595 million. The new tunnel will improve connectivity between Medellin and Uraba and will run from Giraldo to Canasgordas. The tunnel will form part of the Uraba road which runs through the mountain range at 1,500m.
  • Tunnel project in Poland
    March 2, 2012
    Spanish contractor OHL and Polish company Hydrobudowa are now working as a consortium on plans for a new tunnel project in Poland.
  • Modular water treatment solutions
    March 29, 2021
    Siltbuster has provided Costain with four modular treatment solutions, to be used during the delivery of the £200 million Preston Western Distributor Road, linking Preston and southern Fylde to the M55 motorway.