Skip to main content

Polish project tender attracts interest

Interest is strong in the contract to build a new stretch of expressway in the north of Poland. Nine bids have been made for the project to built a 17km stretch of the S16 expressway, which lies close to the Russian enclave of Kaliningrad. This section will connect Borki Wielke and Mragowo and the work also includes construction a bypass around the latter. The bids range in value from €164.4 million up to €234 million. Work is expected to commence in 2020 and take until 2023 to complete.
February 25, 2019 Read time: 1 min

Interest is strong in the contract to build a new stretch of expressway in the north of Poland. Nine bids have been made for the project to build a 17km stretch of the S16 expressway, which lies close to the Russian enclave of Kaliningrad. This section will connect Borki Wielke and Mragowo and the work also includes construction a bypass around the latter. The bids range in value from €164.4 million up to €234 million. Work is expected to commence in 2020 and take until 2023 to complete.

Related Content

  • Russia's key highway development project
    February 8, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports
  • Russia's key highway development project
    May 28, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports. Daytime temperatures top 30°C in September, and with hundreds of shops and hotels, it is not difficult to see why Sochi has become Russia's premier holiday playground. The city, on the east coast of the Black Sea, near the border with Georgia, bustles with tourists, and this is boosted with delegates at the 9th International Investment Forum Sochi 2010.
  • Romania tenders for two sections of Pitesti-Sibiu motorway
    May 14, 2018
    Romania’s national road company has tendered two sections of the Sibiu-Pitesti motorway as part of ongoing work to complete the cross-country A1. Out to tender are sections 1 and 5 of the five-section Sibiu-Pitesti route. Romania’s Autostrada A1 will, when completed, will run for nearly 580km to connect Bucharest with the Banat and Crișana regions in the western part of the country. The motorway starts on the outskirts of Bucharest and runs to Pitești, Sibiu, Deva, Timișoara and Arad before crossing the b
  • Czech highway deal for consortium partners
    February 5, 2019
    A consortium has won a package of works to construct a section of the D35 highway in the Czech Republic. The 12.6km stretch of the D35 highway lies between Opatovice and Časy and the project has a contract value of €132 million, with the work expected to take 44 months to complete. The consortium is headed by Austrian contractor STRABAG with a 41% stake in the deal and also includes the Czech firms Silnice and SMP CZ. This new four-lane link will feature two interchanges. The D35 is part of the northern