Skip to main content

Polish project tender attracts interest

Interest is strong in the contract to build a new stretch of expressway in the north of Poland. Nine bids have been made for the project to built a 17km stretch of the S16 expressway, which lies close to the Russian enclave of Kaliningrad. This section will connect Borki Wielke and Mragowo and the work also includes construction a bypass around the latter. The bids range in value from €164.4 million up to €234 million. Work is expected to commence in 2020 and take until 2023 to complete.
February 25, 2019 Read time: 1 min

Interest is strong in the contract to build a new stretch of expressway in the north of Poland. Nine bids have been made for the project to build a 17km stretch of the S16 expressway, which lies close to the Russian enclave of Kaliningrad. This section will connect Borki Wielke and Mragowo and the work also includes construction a bypass around the latter. The bids range in value from €164.4 million up to €234 million. Work is expected to commence in 2020 and take until 2023 to complete.

Related Content

  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Tender process in hand for Polish ring road project
    August 27, 2014
    The tender process is opening for new road connections in Poland. Ring roads are planned around the Polish city of Radom as well as the town of Gora Kalwarii while there are plans for a new dual carriageway section of the S8 between Radziejowice and Paszko. In all the work is expected to cost€716.5 million. The tender process has been called by the Polish road administration, GDDKiA. The Radom bypass will be some 25km long while a21km stretch of the S8 will be upgraded to dual carriageway status, with this
  • Polish dual carriageway under construction
    June 20, 2018
    Work is underway in Poland on the S1 dual carriageway that will connect the country with neighbouring Slovakia. The project is costing €1.17 billion and the new link should be ready for traffic in 2023. The tender process is underway for one of the sections at present with the bids being reviewed for the stretch linking Pryzbedza and Milowka.
  • Zimbabwe highway project faces delay
    July 12, 2018
    The project to build Zimbabwe’s crucial north-south highway link is facing delays, with the contract now having to be re-awarded. The tender was originally awarded to an Austrian firm, Geiger International, but with progress having proven very slow this has been withdrawn. The deal has not yet been re-awarded. But the Zimbabwe Government is at present in discussions with the second bidder from the original tender process, Anhui Foreign Economic Construction Group Limited (AFECC), over the contract. The hig