Skip to main content

Polish island tunnel connection planned

The tender process is due to commence in Poland for a major new tunnel project in the north of the country. The link will provide an improved road connection for the city of Swinoujscie, running between the islands of Uznam and Wolin. When complete in late 2021 or early 2022, this will be the longest road tunnel ever constructed in Poland. A number of consortia and companies have been preselected by the Polish General Directorate for National Roads and Motorways (GDDKiA) to tender for the project. The plans
February 7, 2017 Read time: 2 mins
The tender process is due to commence in Poland for a major new tunnel project in the north of the country. The link will provide an improved road connection for the city of Swinoujscie, running between the islands of Uznam and Wolin. When complete in late 2021 or early 2022, this will be the longest road tunnel ever constructed in Poland. A number of consortia and companies have been preselected by the 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) to tender for the project. The plans call for the construction of a 3.4km long tunnel that will feature a diameter of 12m and which will be excavated using a TBM. Firms invited to tender include a consortium comprising 3302 Budimex and 2717 Ferrovial, a consortium made up of 1324 Astaldi and Ghella, a consortium called 8002 Polaqua that includes 6423 Toto Costruzioni Generali and ICM and another consortium headed by Austrian contractor 945 Strabag. In addition, 980 OHL has also been invited to tender. Funding worth €179 million is being provided by the EU and will cover 85% of the costs associated with the project. The source for the remainder of the funding has yet to be announced.

Related Content

  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev
  • Hungary’s national road development boom gathers pace
    January 7, 2014
    Hungary is experiencing a road development boom. In line with the country's New Szechenyi Plan (USZT), some €3.67 billion (HUF 1.1 trillion) is to be made available for road development works. National infrastructure development company NIF says it launched road projects worth a total of €1.5 billion (HUF 450 billion) in 2013. Contracts have been signed for the full amount. Hungary's M4 motorway is to be opened in 2016 between Abony and Fegyvernek. The 29km motorway section will also include a bridge over
  • Tender process in hand for Polish ring road project
    August 27, 2014
    The tender process is opening for new road connections in Poland. Ring roads are planned around the Polish city of Radom as well as the town of Gora Kalwarii while there are plans for a new dual carriageway section of the S8 between Radziejowice and Paszko. In all the work is expected to cost€716.5 million. The tender process has been called by the Polish road administration, GDDKiA. The Radom bypass will be some 25km long while a21km stretch of the S8 will be upgraded to dual carriageway status, with this
  • Poland: Rubau Polska makes lowest bid in S61Via Baltica tender
    August 11, 2017
    Poland’s road authority GDDKiA said that five groups have tendered for construction of a 17.5km section of the S61 Expressway. The section runs from Podborze junction to Sniadowo junction and all bids fall within the investor's budget of around €146 million. The lowest offer reportedly was from a Rubau Polska consortium, at around €112 million, while the highest bid was lodged by Budimex at around €139 million.