Skip to main content

Polish island tunnel connection planned

The tender process is due to commence in Poland for a major new tunnel project in the north of the country. The link will provide an improved road connection for the city of Swinoujscie, running between the islands of Uznam and Wolin. When complete in late 2021 or early 2022, this will be the longest road tunnel ever constructed in Poland. A number of consortia and companies have been preselected by the Polish General Directorate for National Roads and Motorways (GDDKiA) to tender for the project. The plans
February 7, 2017 Read time: 2 mins
The tender process is due to commence in Poland for a major new tunnel project in the north of the country. The link will provide an improved road connection for the city of Swinoujscie, running between the islands of Uznam and Wolin. When complete in late 2021 or early 2022, this will be the longest road tunnel ever constructed in Poland. A number of consortia and companies have been preselected by the 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) to tender for the project. The plans call for the construction of a 3.4km long tunnel that will feature a diameter of 12m and which will be excavated using a TBM. Firms invited to tender include a consortium comprising 3302 Budimex and 2717 Ferrovial, a consortium made up of 1324 Astaldi and Ghella, a consortium called 8002 Polaqua that includes 6423 Toto Costruzioni Generali and ICM and another consortium headed by Austrian contractor 945 Strabag. In addition, 980 OHL has also been invited to tender. Funding worth €179 million is being provided by the EU and will cover 85% of the costs associated with the project. The source for the remainder of the funding has yet to be announced.

Related Content

  • Polish projects awarded
    February 3, 2021
    A series of Polish road projects have been awarded.
  • Key Polish projects are underway or compelte
    December 4, 2014
    The Polish town of Marki is to benefit from a new 15km ring road, which will be constructed by a consortium comprising the contractors Astaldi and Salini. The project has a total value of some €167.4 million. The first section will measure 8.1km and run from Kobylka and Marki junctions. Salini plans to complete this stretch in 32 months. Meanwhile, the second section will run between Radzymin Pld and Kobylka junctions and will be completed in 36 months. Meanwhile work on the final section of the S8 road has
  • Poland's highway plans to go ahead
    May 15, 2012
    In Poland, the European Investment Bank has committed itself to maintaining its loan agreement for the A1 highway, despite recent problems over the project. The e1.1 billion loan that the EIB had agreed with Autostrada Poludnie for construction of a 180km section of the A1 highway from Strykow to Pyrzowice, will now be placed at the disposal of the Polish highway authorities. To carry out the work, Poland has to raise a further e503 million, which could be obtained from an issue of road bonds. Autostrada Po
  • Bulgaria signs Shipka Pass deal
    June 17, 2022
    The PSVT consortium picked up the Shipka Pass Tunnel project as part of the bypass for Gabrovo City, a town of around 50,000 situated on the Yantra River.