Skip to main content

Polish dual carriageway under construction

Work is underway in Poland on the S1 dual carriageway that will connect the country with neighbouring Slovakia. The project is costing €1.17 billion and the new link should be ready for traffic in 2023. The tender process is underway for one of the sections at present with the bids being reviewed for the stretch linking Pryzbedza and Milowka.
June 20, 2018 Read time: 1 min

Work is underway in Poland on the S1 dual carriageway that will connect the country with neighbouring Slovakia. The project is costing €1.17 billion and the new link should be ready for traffic in 2023. The tender process is underway for one of the sections at present with the bids being reviewed for the stretch linking Pryzbedza and Milowka. The winner of the tender should be announced in the third quarter of 2018. When complete the new S1 will provide an improved road connection from the A1 highway and Katowice Airport to the border at Zwardon with Slovakia, where it will link with the neighbouring country’s D3 highway. This will reduce journey times between Bielsko-Biala in Poland to the Slovakian border to just 30 minutes.

Related Content

  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Brodno-Kysucke Nove Mesto bypass progresses
    September 22, 2022
    Metrostav was chosen to build the D3 Zilina-Kysucké Nové Mesto feeder in Brodno town.
  • Hungarian dual carriageway project underway
    June 12, 2019
    Work is underway on the M76 dual carriageway project in Hungary, with the first section due for completion in summer 2020. Building the 40km dual carriageway is costing over €523 million. The project includes building a bridge at Balatonszentgyorgy, which is due for completion shortly. When it opens to traffic, the M76 will connect the M7 motorway (the E71 route) with the M74 route at Zalaegerszeg.
  • Hungary-Slovakia border connections expanding
    May 13, 2025
    Hungary-Slovakia border connections are being revamped and expanded.