Skip to main content

Polish dual carriageway under construction

Work is underway in Poland on the S1 dual carriageway that will connect the country with neighbouring Slovakia. The project is costing €1.17 billion and the new link should be ready for traffic in 2023. The tender process is underway for one of the sections at present with the bids being reviewed for the stretch linking Pryzbedza and Milowka.
June 20, 2018 Read time: 1 min

Work is underway in Poland on the S1 dual carriageway that will connect the country with neighbouring Slovakia. The project is costing €1.17 billion and the new link should be ready for traffic in 2023. The tender process is underway for one of the sections at present with the bids being reviewed for the stretch linking Pryzbedza and Milowka. The winner of the tender should be announced in the third quarter of 2018. When complete the new S1 will provide an improved road connection from the A1 highway and Katowice Airport to the border at Zwardon with Slovakia, where it will link with the neighbouring country’s D3 highway. This will reduce journey times between Bielsko-Biala in Poland to the Slovakian border to just 30 minutes.

Related Content

  • Strabag wins Polish road contract
    September 17, 2018
    Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.
  • Plans in hand for Slovakia’s longest tunnel
    June 16, 2014
    In Slovakia plans are being made for a new project that will become the country’s longest tunnel when it is complete. Salini Impregilo is the contractor heading the project. The work looks set to cost in the order of €410 million and the project is due for completion in late 2019 or early 2020. Although there was a lower priced bid for the project, this was excluded due to technical problems relating to the proposed tunnel exits. The Visnove Tunnel will measure some 7.7km long and will be constructed in the
  • Polish projects to get Cohesion Fund cash
    March 6, 2018
    Almost €790 million will be allocated from the Cohesion Fund for three road projects which improve the country's communication with Germany and other Western and Eastern European countries. Around €270 million will be for the Garwolin-to-Kurow S17 dual carriageway, another €125 million to build a stretch of the S6 dual carriageway between Goleniow and Kielp and €390 million for the S2 on the outskirts of Warsaw.
  • Date set to complete D1 Višňové Tunnel section
    July 20, 2023
    The D1 section between Lietavská Lúčka and Dubná Skala in Slovakia includes the partially completed 7.5km twin-tube Višňové Tunnel - to be the country's longest.