Skip to main content

Polish bridge construction project underway

Construction work is underway for a new bridge forming part of the S3 expressway in Poland. The second bridge at Cigacice is close to completion and is in the Lubuskie Voivodeship, Poland. The S3 route represents a major construction project for Poland with work ongoing for the stretch connecting Sulechów and Nowa Sól. This section includes building a new bridge spanning the Odra River at Cigacice is being built. This bridge is built from either side of the river and now is almost connected and is expected
September 30, 2019 Read time: 2 mins
Technology supplied by ULMA is assisting with the construction of a new expressway bridge close to Cigacice in Poland

Construction work is underway for a new bridge forming part of the S3 expressway in Poland. The second bridge at Cigacice is close to completion and is in the Lubuskie Voivodeship, Poland.

The S3 route represents a major construction project for Poland with work ongoing for the stretch connecting Sulechów and Nowa Sól. This section includes building a new bridge spanning the Odra River at Cigacice is being built. This bridge is built from either side of the river and now is almost connected and is expected to be finished by the end of 2019.

A few years ago the first bridge was built in Cigacice and the road is now being dualled with work underway on the second bridge, close to the first. As for the earlier MS-4A bridge, the new MS-4B bridge is being built using a Balanced Cantilever Formwork Carriage CVS to span the Odra river. The ULMA carriages are designed to offer significant weight-bearing capacity without compromise the ability to adapt to varied cross-sections. For those spans located above the ground, the incremental launching method has been used.

Related Content

  • Ulma in Poland’s S7 tunnel
    October 22, 2020
    Construction of Poland’s longest road tunnel is progressing with an MK Formwork Carriage system from Spanish manufacturer Ulma.
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • Doka rises to the challenge on Turkey’s Eyiste Viaduct
    June 4, 2019
    Formwork specialist Doka recently rose to the challenge on Turkey’s Eyiste Viadust, the country’s highest bridge with piers up to 155m tall. The Eyiste Viaduct will be part of a route between Central Anatolia and Turkey’s Mediterranean region, shortening travel time between the cities of Konya and Alanya. Cantilever forming travellers and Doka’s automatic climbing formwork Xclimb 60 were part of the construction solution. The viaduct is nearly 1.4km long and carried by two abutments and eight piers, stret
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s