Skip to main content

Polish bridge construction project underway

Construction work is underway for a new bridge forming part of the S3 expressway in Poland. The second bridge at Cigacice is close to completion and is in the Lubuskie Voivodeship, Poland. The S3 route represents a major construction project for Poland with work ongoing for the stretch connecting Sulechów and Nowa Sól. This section includes building a new bridge spanning the Odra River at Cigacice is being built. This bridge is built from either side of the river and now is almost connected and is expected
September 30, 2019 Read time: 2 mins
Technology supplied by ULMA is assisting with the construction of a new expressway bridge close to Cigacice in Poland

Construction work is underway for a new bridge forming part of the S3 expressway in Poland. The second bridge at Cigacice is close to completion and is in the Lubuskie Voivodeship, Poland.

The S3 route represents a major construction project for Poland with work ongoing for the stretch connecting Sulechów and Nowa Sól. This section includes building a new bridge spanning the Odra River at Cigacice is being built. This bridge is built from either side of the river and now is almost connected and is expected to be finished by the end of 2019.

A few years ago the first bridge was built in Cigacice and the road is now being dualled with work underway on the second bridge, close to the first. As for the earlier MS-4A bridge, the new MS-4B bridge is being built using a Balanced Cantilever Formwork Carriage CVS to span the Odra river. The ULMA carriages are designed to offer significant weight-bearing capacity without compromise the ability to adapt to varied cross-sections. For those spans located above the ground, the incremental launching method has been used.

Related Content

  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.