Skip to main content

Poland’s planned programme of highway construction

Poland’s National Road Construction Programme has been amended for the 2011-15 period. One of the new projects being handled is for the southern section of the ring-road (POW) for capital Warsaw will benefit. The tender process is opening for the construction of an 18.5km section of the S2 dual carriageway from Pulawska junction to Lubelska junction. The General Direction of National Roads and Motorways (GDDKiA) is keen for the southern Warsaw ring road to be open to traffic by 2019. The Pulawska-Lubleska s
December 13, 2013 Read time: 2 mins
Poland’s National Road Construction Programme has been amended for the 2011-15 period. One of the new projects being handled is for the southern section of the ring-road (POW) for capital Warsaw will benefit. The tender process is opening for the construction of an 18.5km section of the S2 dual carriageway from Pulawska junction to Lubelska junction. The General Direction of National Roads and Motorways (1361 GDDKiA) is keen for the southern Warsaw ring road to be open to traffic by 2019. The Pulawska-Lubleska section of the road will be challenging to construct however and is expected to cost some €1.6 billion. The high price is due in part to the need for a tunnel running under Ursynow district.

Meanwhile in Torun a new road bridge spanning the Vistula River has been opened to traffic. The General Elzbieta Zawacka Bridge is 540m long and 30m wide, with two lanes for vehicle traffic, a pedestrian path on one side and a cycle lane on the other. The steel bridge features two 270m arched spans resting on a single support in the river. Construction commenced in November 2010 and the bridge cost €180 million to construct, with the EU supplying some of the funding required.

For more information on companies in this article

Related Content

  • Peri has Polish bridge covered
    February 6, 2012
    A new bridge is being constructed across the Vistula River near Grudzi?dz, Poland, and for the foreland bridge from south-east direction, a so-called incremental launching method is being used. Two lanes, each some 556m long, are being constructed in 25 concreting cycles with standard lengths of 24m, while the formwork is 25m long and is positioned behind the bridge abutments.
  • Kenya highway projects starting
    March 11, 2019
    Construction work is starting on two important road projects in Kenya. These are for the Dongo Kundu Southern Bypass and for the Mau Highway. The Mau highway project is worth US$2 billion and forms part of the route that links Kenya’s key port at Mombasa through its capital Nairobi to the border with neighbouring Uganda. The 180km Nairobi-Nakuru-Mau section of the A104 route will feature two lanes in either direction. The deal is being handled under a package that includes design, financing, maintenance a
  • Poland lines up tenders until 2023
    November 7, 2018
    A Polish parliamentary commission has heard that €11.14 billion of road investment within the 2014-23 programme of upgrades has yet to be tendered. This past summer, the government announced that a bridge on the San River near Jarosław will be the first of 22 to be constructed under the Polish government’s Bridges for Regions programme. Central government will fund around 80% or the programme that is expected to cost about €534 million, said Mateusz Morawiecki, the prime minister.
  • Vietnam’s US$5.5 billion ring road project
    September 16, 2024
    Vietnam is planning US$5.5 billion ring road project for HCMC.