Skip to main content

Poland road tenders being announced

Polish General Directorate for National Roads and Motorways (GDDKiA) is announcing tenders for the construction of a series of major routes. One key stretch is for a 41km section of the S14 dual carriageway, which will link the A2 highway with the S8 dual carriageway and which will constitute Lodz's western ring-road. According to declarations of the Polish Infrastructure and Development Ministry, work on the S14 project will commence in 2016.
October 5, 2015 Read time: 1 min
3519 Polish General Directorate for National Roads and Motorways (GDDKiA) is announcing tenders for the construction of a series of major routes. One key stretch is for a 41km section of the S14 dual carriageway, which will link the A2 highway with the S8 dual carriageway and which will constitute Lodz's western ring-road. According to declarations of the Polish Infrastructure and Development Ministry, work on the S14 project will commence in 2016.

A further two tenders have been announced by GDDKiA for the construction of the S6 dual carriageway or so-called Trasa Kaszubska which will run from Lebrkr to Gdynia. The first tender envisages the construction of two dual carriageway sections which will be 32.4km long, while the second tender will concern a 10.3mn section between the Luzino and the Szemud junction, and a 22.8km section between the Szemud junction and the Gdyna Wielki Kack junction.

For more information on companies in this article

Related Content

  • Astaldi begins drilling tunnels on Poland’s S7 dual carriageway
    March 14, 2017
    Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
  • Poland is planning a series of highway projects
    March 15, 2013
    Poland’s Ministry of Transport plans to invest heavily in road projects from 2014-2020. The Polish road authority, GDDKiA, will invest €16.91 billion in new roads. A key project will be for the section of the Berlin-Lisbon A2 highway that runs through Poland. This will run through Zakret near Warsaw and connect to the Minsk Mazowiecki ring road and is expected to cost close to €1.7 billion. Meanwhile the A1 highway linking Pyrzowice and Tuszyn will cost in excess of €1.8 billion. GDDKiA is also planning to
  • EIB lends €900mn for Poland’s S7 and S8 dual carriageways
    December 14, 2012
    Polish state-owned Bank Gospodarstwa Krajowego (BGK) has signed a €900 million loan agreement with the European Investment Bank (EIB). The money from the loan will be allocated via the National Road Fund (KFD) in the construction of S7 and S8 dual carriageways. The three-section S7 carriageway will be 90.5km long, while the four-section S8 carriageway will stretch over 301km. Both routes will be part of the Trans-European Networks (TEN) system.
  • Alleviating Moscow's ring road congestion
    April 10, 2012
    The US$10.5 billion CKAD (Moscow Region Ring Road), being planned and procured under the direction of the Ministry of Transport of Russia, is just one of the roads highlighted at the Moscow Forum.