Skip to main content

Plans moving forward for key Turkish highway

Plans are moving forward in Turkey for the construction of a new highway project. Mott MacDonald has been named lenders’ technical advisor by the IC Ictas-Astaldi (ICA) consortium for a 60km section of the Northern Marmara highway. This deal is significant and the stretch forms the first of a number of phases of the highway. The project is being delivered under a 10 year, US$2.5 billion public-private partnership (PPP).
October 11, 2013 Read time: 2 mins
Istanbul is on record as one of the world's most traffic-congested cities
Plans are moving forward in Turkey for the construction of a new highway project. 2579 Mott MacDonald has been named lenders’ technical advisor by the IC Ictas-Astaldi (ICA) consortium for a 60km section of the Northern Marmara highway. This deal is significant and the stretch forms the first of a number of phases of the highway. The project is being delivered under a 10 year, US$2.5 billion public-private partnership (PPP).
 
The project involves the design, construction, maintenance and operation of the 60km dual four lane Northern Marmara highway between Odayeri and Paşaköy. It includes construction of 55km of connecting roads, 19 motorway junctions, 67 viaducts, and seven tunnels and a road/rail stay cable stiffened suspension bridge across the Bosphorus. The new bridge, designed by Michel Virlogeux and Swiss consultant T-Engineering, will be a combined road and rail suspension with a main span of 1.4km. It will be the first long span bridge to accommodate an eight lane highway and a two line railway on the same level, giving it a width of 59m. The structure will also have the world’s tallest towers, at over 320m.
 
Mott MacDonald will carry out a technical due diligence review of the project documentation produced by concession company ICA up to financial close. This will include a review of the transaction documents, design, construction methodology, operation and maintenance proposals, budget, programme, payment mechanism and risk analysis. Following financial close, Mott MacDonald will undertake construction and operations monitoring on behalf of lenders.
 
The new east-west route should alleviate congestion on existing routes across Istanbul, including the two existing bridges across the Bosphorus.

For more information on companies in this article

Related Content

  • Massey Tunnel project to be Design-Build-Finance-Operate-Maintain
    January 25, 2016
    The provincial British Columbia government in western Canada has chosen a Design-Build-Finance-Operate-Maintain (DBFOM) procurement model for the Vancouver region’s 10-lane bridge replacement for the ageing Massey Tunnel. The US$2.5 billion project includes a bridge and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day and is often congested during rush hours.
  • Georgia's East-West Highway
    February 17, 2012
    One of the most important priorities of the Government of Georgia is the construction and rehabilitation of the East-West Highway in accordance with international standards.
  • Record attendance for Istanbul’s E&E conference
    June 14, 2012
    The Eurasphalt & Eurobitume 2012 event in Turkey has attracted record attendance figures, although final figures were not available at the time of writing.
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b